My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01021 <br />CASH ALLOWANCES <br />PART 1 -GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Schedule of monetary amounts of allowances in Contract Sum for <br />purchase products. <br />B. Costs in Contact Sum other than in Allowance. <br />C. Procedures for administration of Allowances. <br />1.02 RELATED REQUIREMENTS <br />A. Document 00700: General Conditions. <br />B. Section 01410: Testing and Testing Laboratory Services. <br />1.03 SCHEDULE OF ALLOWANCES <br />A. Section 01410 — Up to $5,000.00 for testing and testing laboratory <br />services. <br />1.04 COSTS INCLUDED IN ALLOWANCES <br />A. Cost of product to Contractor, less applicable trade discounts. <br />B. Delivery to site. <br />C. Applicable taxes. <br />D. Products handling at site, including unloading, uncrating, and storage. <br />E. Protection of products from elements and from damage. <br />F. Labor and installation and finishing, except when installation is specified <br />as part of allowance. <br />G. Other expenses required to complete installation. <br />H. Contractor overhead and profit. <br />09/03 <br />01021 -1 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.