My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />C <br />1 <br />SECTION 01025 <br />MEASUREMENT AND PAYMENT <br />PART 1 -GENERAL <br />1.01 RELATED REQUIREMENTS <br />A. <br />General provisions of Contract, including General and Supplementary <br />Conditions. <br />B. Other Division -1 Specification Sections. <br />1.02 SECTION INCLUDES <br />A. <br />Administrative and procedural requirements for determining Work <br />completed under unit price contract. <br />1.03 GENERAL REQUIREMENTS f <br />A. <br />ot <br />Lump Sum and unit prices shall include pro unit ofalll costs <br />including red ost <br />the complete construction of the specified <br />of materials and delivery; <br />cost of installation; labor including social <br />security, insurance, and other required fringe eof fits; m workman <br />and <br />machinery; taxes; testing; <br />ensation insurance; bond premiums, and <br />comp surveys; incidental expenses; <br />supervision. <br />B. The Owner reserves the right to reject the tablishedtunit prices, ra d to <br />of completed work that involves use of <br />have this Work measured by an in <br />surveyor acceptable to <br />the Contractor at the Owner's expense. <br />C. Contract Sum adjustments will be by Change Order on basis of net <br />accumulative change for each unit price category. <br />1. Except as otherwise specified, unit prices shall apply to both <br />deductive and additive variations of qua shall remain in <br />2. Lump sum and unit prices in the Agreement <br />effect until date of final completion of the entire Work. <br />D. Partial payment for material and equipment properly stored and <br />protected will be made in accordance with requirements of the General <br />Conditions. <br />09/03 <br />01025 -1 <br />03- 3148.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.