Laserfiche WebLink
11 <br />E. Payment will be made at the respective contract unit and lump sum <br />price for each item shown in the Agreement, installed and <br />compensat on ted <br />for <br />which price and payment shall constitute <br />furnishing all materials and performing all Work in connection <br />' therewith and incidental thereto. <br />1, No separate payment will be made for: <br />' a. Record Drawings <br />b. Construction of haul roads as may be required. <br />C. Testing <br />F. Unit Price Abbreviations: <br />1. Lineal Feet - LF <br />2. Acre - AC <br />3. Cubic Yard - CY <br />4. Square Yard - SY <br />5. Each - EA <br />' 6, Lump Sum - LS <br />7. Ton - TN <br />8. Net Mile - NM <br />tg, Gross Mile - GM <br />10. Gallons - GA <br />11. Thousand Gallons - MG <br />PART 2 - PRODUCTS (Not applicable) <br />PART 3 - EXECUTION <br />3.01 MEASUREMENT AND PAYMENT <br />A. Electrical <br />' 1. Lump Sum <br />2. Maintenance of traffic flashing include <br />boards,sta d any other <br />construction signs, 9 ow <br />t miscellaneous devices required to conform with the Manual of <br />Uniform Traffic Control Devices and the current Florida <br />Department of Transportation Roadway and Traffic Design <br />Standards ( "600" Series). Also includes the cost of providing <br />temporary pavement markings indicating lane line and storage <br />areas for turning movements, throughout the project, at the end <br />' of each day's operation. <br />B. Contingency: See Specification Section 01021, "Cash Allowances." <br />C. The Project Mobilization <br />01025 -2 03- 3148.A -R <br />09/03 <br />