Laserfiche WebLink
t <br />1 <br />I <br />I <br />The project mobilization item ahtmente of Transportation, <br />accordance with the Florida Dep <br />Standard Specifications for Road & Bridge Construction (latest <br />edition); MOBILIZATION. <br />2. The maximum amount allowed fOrcent of he total contract d <br />cont a <br />demobilization item shall be five (5) per <br />amount. <br />includes, but is not limited to, mobilization of <br />3. Mobilization <br />equipment, all surveying, all supervision, cost of all bonds and <br />warranties, all permit fees, all insurance and demobilization. <br />3.02 PROTECTION <br />Where pavement, trees, shrubbery, fences or other property or surface <br />structures not designated as pay items, have been damaged, removed <br />or disturbed by the Contractor, whether deliberately or through failure <br />to carry out the requirements of the Contract <br />direction ofmthesEngineerwor <br />municipal ordinances or the specs <br />such <br />through failure to employ usual and reas °a y ed gat the <br />property and surface structures shall b e replaced or repair <br />expense of the Contractor to a condition Equ lleeo. that before work <br />began within a time frame approved by the g <br />Im <br />END OF SECTION <br />' 09!03 01025 -3 <br />03- 3148.A -R <br />