My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LI <br />IJ <br />1�' <br />SECTION 01340 <br />SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES <br />PART 1 -GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. The Contractor shall submit to the Engineer for review, such working <br />drawings, shop drawings, test reports and data on materials and <br />equipment (hereinafter in this article called data), and material samples <br />(hereinafter in this article called samples) as are required for the proper <br />control of work, including but not limited to those working drawings, <br />shop drawings, data and samples for materials and equipment <br />specified elsewhere in the Specifications and in the Contract <br />Drawings. <br />B. Within fifteen (15) calendar days after the effective date of the Agree- <br />ment, the Contractor shall submit to the Engineer a complete list of <br />preliminary data for which Shop Drawings are to be submitted. <br />Included in this list shall be the names of all proposed manufacturers <br />furnishing specific items. Review of this list by the Engineer shall in <br />no way expressed or implied relieve the Contractor from submitting <br />complete Shop Drawings and providing materials, equipment, etc., <br />fully in accordance with the Specifications. This procedure is required <br />in order to expedite final review of Shop Drawings. <br />C. The contractor is to maintain an accurate updated submittal log and <br />will bring this log to each scheduled progress meeting with the Owner <br />and Engineer. This log should include the following items: <br />1. Submittal- Description and Number assigned. <br />2. Date to Engineer. <br />3. Date returned to Contractor (from Engineer). <br />4. Status of Submittal (Approved /Resubmit /Rejected). <br />5. Date of Resubmittal and Return (as applicable). <br />6. Date material released (for fabrication). <br />7. Projected date of fabrication. <br />8. Projected date of delivery to site. <br />1.02 RELATED REQUIREMENTS <br />A. Section 01600: <br />B. Section 01720: <br />Material and Equipment <br />Project Record Documents <br />09/03 <br />01340 -1 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.