Laserfiche WebLink
n <br />C <br />11 <br />G. The Contractor shall be responsible for and bear all cost of damages <br />which may result from the ordering of any material or from proceeding <br />with any part of work prior to the review by Engineer of the necessary <br />Shop Drawings. <br />1.04 ENGINEER'S REVIEW OF SHOP DRAWINGS <br />A. The Engineer's review of drawings, data and samples submitted by the <br />Contractor will cover only general conformity to the Specifications, <br />external connections, and dimensions which affect the installation. <br />The Engineer's review and exceptions if any, will not constitute an <br />approval of dimensions, quantities, and details of the material, <br />equipment, device, or item shown. <br />B. The review of drawings and schedules will be general, and shall not be <br />construed: <br />1. as permitting any departure from the Contract requirements; <br />2. as relieving the Contractor of responsibility for any errors, <br />including details, dimensions, and materials; <br />3. as approving departures from details furnished by the Engineer, <br />except as otherwise provided herein. <br />C. If the drawings or schedule as submitted describe variations per <br />subparagraph (1.05.C), and show a departure from the Contract <br />requirements which Engineers finds to be in the interest of the Owner <br />and to be minor as not to involve a change in the Contract Price or <br />time for performance, the Engineer may return the reviewed drawings <br />without noting an exception. <br />1 09/03 <br />D. When reviewed by the Engineer, each of the Shop Drawings will be <br />identified as having received such review being so stamped and dated. <br />Shop Drawings stamped "REJECTED" and with required corrections <br />shown will be returned to the Contractor for correction and <br />resubmittal. <br />E. Resubmittals will be handled in the same manner as the first <br />submittals. On resubmittals, the Contractor shall direct specific <br />attention, in writing or on resubmitted Shop Drawings, to revisions <br />other than the corrections requested by the Engineer on previous <br />submissions. The Contractor shall make any corrections required by <br />the Engineer. <br />F. If the Contractor considers any correction indicated on the drawings to <br />constitute a change to the Contract Drawings or Specifications, the <br />Contractor shall give written notice thereof to the Engineer. <br />01340 -3 03- 4138.A -R <br />