My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01410 <br />TESTING AND TESTING LABORATORY SERVICES <br />PART 1 -GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Contractor shall employ and pay for the services of an Independent <br />Testing Laboratory to perform testing as required by the Owner to <br />verify conformity with the Contract Documents. <br />1. Contractor shall cooperate with the laboratory to facilitate the <br />execution of its required services. <br />2. Employment of the laboratory shall in no way relieve <br />Contractor's obligations to perform the Work of the Contract. <br />1.02 RELATED REQUIREMENTS <br />A. Conditions of the Contract: Inspections and testing required by laws, <br />ordinances, rules, regulations, orders or approvals of public authorities. <br />B. Respective sections of specifications: Certification of products. <br />C. Each specification section listed: Laboratory tests required and <br />standards for testing. <br />D. Testing laboratory inspection, sampling and testing is required for, but <br />not limited to the following: <br />1. Section 02200: Earthwork <br />2. Section 02513: Asphaltic Concrete Paving <br />3. Section 03300: Cast -in -Place Concrete <br />1.03 LIMITATIONS OF AUTHORITY OF TESTING LABORATORY <br />A. Laboratory is not authorized to: <br />1. Release, revoke, alter or enlarge on requirements of Contract <br />Documents <br />2. Approve or accept any portion of the Work <br />3. Perform any duties of the Contractor <br />09/03 01410 -1 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.