My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />surfaces to prevent mixing with foreign matter. <br />B. All materials and equipment to be incorporated in the work shall be <br />handled and stored by the Contractor before, during, and after shipment <br />in a manner to prevent warping, o o an <br />damge twisting, bending, kid what <br />breaking, soeveo the <br />chipping, <br />rustig, and any injury, theft <br />material or equipment. <br />C. Cement, sand and lime shall be stored under a roof and off the ground <br />and shall be kept completely dry at all times. All structural and <br />miscellaneous steel, and reinforcing steel shall be stored off the ground <br />or otherwise to prevent accumulations of dirt or grease, and to minimize <br />rusting. Brick, block and similar masonry products shall be handled and <br />stored in a manner to reduce breakage, chipping, cracking, and spalling <br />to a minimum. <br />D. Moving parts shall be rotated a minimum of once weekly to insure <br />proper lubrications and to avoid metal -to -metal "welding ". Upon <br />installation of the equipment, the Contractor shall start the equipment, <br />at least half load, once weekly for an adequate period of time to insure <br />that the equipment does not deteriorate from lack of use. <br />' 09/03 <br />J <br />E. All materials which, in the opinion of the Engineer, <br />have become so <br />damaged as to be unfit heosite of the intended specified l <br />promptly removed from and the Contractor shall <br />receive no compensation for the damaged material or its removal. <br />F. Arrange storage in aions of stored Products to assure that Products) <br />Make periodic inspect are <br />maintained under specific conditions, and free from damage or <br />deterioration. <br />G. Protection After Installation: <br />1. Provide substantial coverings as necessary to protect installed <br />products from damage from traffic and subsequent construction <br />operations. Remove <br />H. The Contractor shall eeed to the Owner under equipment, and <br />supplies sold and dell t until final <br />inspection of the work and acceptance thereof by the Owner. In the <br />event any such material, equipment, and supplies are lost, stolen, <br />damaged, or destroyed prior to final inspection and acceptance, the <br />Contractor shall replace same without additional cost to the Owner. <br />01600 -4 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.