My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 09/03 01600 -3 03- 4138.A -R <br />1. Maintain one set of complete instructions at the job site during <br />installation and until completion. <br />B. <br />Handle, install, connect, clean, condition and adjust products in strict <br />accord with such instructions and in conformity with specified <br />' <br />requirements. <br />1. Should job conditions or specified requirements conflict with <br />manufacturer's instructions, consult with Engineer for further <br />' <br />instructions. <br />2. Do not proceed with work without clear instructions. <br />C. <br />Perform work in accord with manufacturer's instructions. Do not omit <br />any preparatory step or installation procedure unless specifically <br />modified or exempted by Contract Documents. <br />1.05 TRANSPORTATION <br />AND HANDLING <br />A. <br />Arrange deliveries of Products in accord with construction schedules, <br />coordinate to avoid conflict with work and conditions at the site. <br />1. Deliver Products in undamaged condition, in manufacturer's <br />roriginal <br />containers or packaging, with identifying labels intact and <br />legible. <br />2. Immediately on delivery, inspect shipments to assure compliance <br />with requirements of Contract Documents and approved <br />submittals, and that Products are properly protected and <br />undamaged. <br />B. <br />Provide equipment and personnel to handle Products by methods to <br />prevent soiling or damage to Products or packaging. <br />1.06 STORAGE AND PROTECTION <br />A. <br />Store Products in accord with manufacturer's instructions, with seals <br />and labels intact and legible. <br />1. Store products subject to damage by the elements in <br />weather -tight enclosures. <br />2. Maintain temperature and humidity within the ranges required by <br />manufacturer's instructions. <br />3. Store fabricated products above the ground on blocking or skids, <br />prevent soiling or staining. Cover products which are subject to <br />deterioration with impervious sheet coverings, provide adequate <br />ventilation to avoid condensation. <br />4. Store loose granular materials in a well drained area on solid <br />1 09/03 01600 -3 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.