My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.03 APPROVAL OF MATERIALS <br />' A. Only new materials and equipment shall be incorporated in the work. <br />All materials and equipment furnished by the Contractor shall be subject <br />to the inspection and approval of the Engineer. No material shall be <br />delivered to the work without prior approval of the Engineer. <br />B. Within 30 days after the effective date of the Agreement, the <br />' Contractor shall submit to the Engineer, data relating to materials and <br />equipment he proposes to furnish for the work. Such data shall be in <br />sufficient detail to enable the Engineer to identify the particular product <br />and to form an opinion as to its conformity to the specifications. The <br />data shall comply with Paragraph 1.07 of this Section. <br />09/03 <br />01600 -2 <br />03- 4138.A -R <br />C. <br />Facilities and labor for handling and inspection of all materials and <br />equipment shall be furnished by the Contractor. If the Engineer <br />requires, either prior to beginning or during progress of the work, the <br />Contractor shall submit samples of materials for such special tests as <br />may be necessary to demonstrate that they conform to the <br />specifications. Such samples shall be furnished, stored, packed, and <br />shipped as directed at the Contractor's expense. Except as otherwise <br />noted, the Owner will make arrangements for and pay for the tests. <br />D. <br />The Contractor shall submit data and samples sufficiently early to permit <br />consideration and approval before materials are necessary for <br />incorporation in the work. Any delay of approval resulting from the <br />Contractor's failure to submit samples or data promptly shall not be <br />as a basis of claim against the Owner or the Engineer. <br />used <br />facilitate the <br />E. <br />In order to demonstrate the proficiency of workmen or to <br />choice among several textures, types, finishes, and surfaces, the <br />Contractor shall provide such samples of workmanship or finish as may <br />be required. <br />F. <br />The materials and equipment used on the work shall correspond to the <br />approved samples or other data. <br />1.04 MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION <br />A. <br />When Contract Documents require that installation of work shall comply <br />with manufacturer's printed instruction, obtain and distribute copies of <br />such instructions to parties involved in the installation, including copies <br />to the Engineer. <br />09/03 <br />01600 -2 <br />03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.