My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II <br />1 <br />u <br />�I <br />LI <br />I <br />d. Cost data comparing the proposed substitution with the <br />Product specified <br />e. Any required license fees or royalties <br />f. Availability of maintenance service, and source of <br />replacement materials <br />3. The Engineer shall be the judge of the acceptability of the <br />proposed substitution. <br />4. No substitutions will be considered by the Engineer after 30 days <br />from the Contract Date. <br />D. Contractor's Representation: <br />1. A request for a substitution constitutes a representation that <br />Contractor: <br />a. Has investigated the proposed Product and determined that <br />it is equal to or superior in all respects to that specified <br />b. Will provide the same warranties or bonds for the <br />substitution as for the Product specified <br />C. Will coordinate the installation of an accepted substitution <br />into the Work, and make such other changes as may be <br />required to make the Work complete in all respects <br />d. Waives all claims for additional costs, under his <br />responsibility, which may subsequently become apparent. <br />E. The Engineer will review requests for substitutions with reasonable <br />promptness, and notify Contractor, in writhing, of the decision to accept <br />or reject the requested substitution. <br />1.08 SPECIAL TOOLS <br />A. Manufacturers of equipment and machinery shall furnish any special <br />tools (including grease guns or other lubricating devices) required for <br />normal adjustment, operations and maintenance, together with <br />instructions for their use. The Contractor shall preserve and deliver to <br />the Owner these tools and instructions in good order no later than upon <br />completion of the Contract. <br />1.09 STORAGE AND HANDLING OF EQUIPMENT ON SITE <br />1 09/03 <br />A. Because of the long period allowed for construction, special attention <br />shall be given to the storage and handling of equipment on site. As a <br />minimum, the procedure outlined below shall be followed: <br />1. Equipment shall not be shipped until approved by the Engineer. <br />01600 -6 03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.