My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
at the Contractor's expense. <br />F1 <br />1 09/03 01600 -7 03- 4138.A -R <br />II <br />I <br />The intent of this requirement is to reduce on -site storage time <br />prior to installation and /or operation. Under no circumstances <br />shall equipment be delivered to the site more than one month <br />prior to installation without written authorization from the <br />' <br />Engineer unless it is to be stored as specified in Paragraph 1.06 <br />herein upon arrival. Operation and maintenance data as described <br />in Paragraph 1.08 of Section 01730 shall be submitted to the <br />Engineer for review prior to shipment of equipment. <br />2. <br />All equipment having moving parts such as gears, electric motors, <br />etc. and /or instruments shall be stored in a temperature and <br />' <br />humidity controlled building approved by the Engineer, until such <br />time as the equipment is to be installed. <br />3. <br />All equipment shall be stored fully lubricated with oil, grease, etc. <br />unless otherwise instructed by the manufacturer. <br />4. <br />Manufacturer's storage instructions shall be carefully studied by <br />the Contractor and reviewed with the Engineer by him. These <br />instructions shall be carefully followed and a written record of <br />this kept by the Contractor. <br />' <br />5. <br />Moving parts shall be rotated a minimum of once weekly to <br />lubrication and to avoid metal -to -metal "welding ". <br />insure proper <br />Upon installation of the equipment, the Contractor shall start the <br />equipment, at least half load, once weekly for an adequate period <br />of time to insure that the equipment does not deteriorate from <br />lack of use. <br />6. <br />Lubricants shall be changed upon completion of installation and <br />' <br />as frequently as required thereafter during the period between <br />installation and acceptance. Mechanical equipment to be used in <br />the work, if stored for longer than ninety (90) days, shall have <br />the bearings cleaned, flushed and lubricated prior to testing and <br />start up, at no extra cost to the Owner. <br />7. <br />Prior to acceptance of the equipment, the Contractor shall have <br />' <br />the manufacturer inspect the equipment and certify that its <br />condition has not been detrimentally affected by the long storage <br />period. Such certifications by the manufacturer shall be deemed <br />' <br />to mean that the equipment is judged by the manufacturer to be <br />in a condition equal to that of equipment that has been shipped, <br />installed, tested and accepted in a minimum time period. As <br />such, the manufacturer will guarantee the equipment equally in <br />both instances. If such a certification is not given, the equipment <br />shall be judged to be defective. It shall be removed and replaced <br />at the Contractor's expense. <br />F1 <br />1 09/03 01600 -7 03- 4138.A -R <br />II <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.