My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hosepower Electric #1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-09-01 SIB Entrance Signs (Electrical)
>
Hosepower Electric #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 11:34:04 PM
Creation date
1/6/2011 10:20:49 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electric)
Bid No. (xx-xx-xx)
03-09-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�i <br />t <br />1 <br />L� <br />L <br />1.10 WARRANTY <br />A. For all major pieces of equipment, submit a warranty from the <br />equipment manufacturer as specified in Section 01740. <br />1.1 1 SPARE PARTS <br />A. Spare parts for certain equipment provided under Division 11 through <br />16 have been specified in the pertinent sections of the Specifications. <br />The Contractor shall collect and store all spare parts so required in an <br />area to be designated by the Engineer. In addition, the Contractor shall <br />furnish to the Engineer an inventory listing all spare parts, the equipment <br />they are associated with, the name and address of the supplier, and the <br />delivered cost of each item. Copies of actual invoices for each item <br />shall be furnished with the inventory to substantiate the delivered cost. <br />1.12 GREASE, OIL AND FUEL <br />A. All grease, oil and fuel required for testing of equipment shall be <br />furnished with the respective equipment. The Owner shall be furnished <br />with a year's supply of required lubricants including grease and oil of the <br />type recommended b the manufacturer with each item of the equipment <br />supplied under Division 11 through 16. <br />B. The Contractor shall be responsible for changing the oil in all drives and <br />intermediate drives of each mechanical equipment after initial break -in of <br />the equipment, which in no event shall be any longer than three weeks <br />of operation. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />09/03 <br />END OF SECTION <br />03- 4138.A -R <br />
The URL can be used to link to this page
Your browser does not support the video tag.