Laserfiche WebLink
5. Signature of Contractor or his authorized representative. <br />PART 2 - PRODUCTS (Not Applicable) <br />PART 3 - EXECUTION <br />3.01 FINAL CLEANING <br />A. Remove temporary protection and facilities installed for protection of <br />the Work during construction. <br />B. Comply with regulations of authorities having jurisdiction and safety <br />standards for cleaning. Do not burn waste materials. Do not bury <br />debris or excess materials on the Owner's property. Do not discharge <br />volatile, harmful or dangerous materials into drainage systems. <br />Remove waste materials from the site and dispose of in a lawful <br />manner. <br />C. Where extra materials of value remaining after completion of <br />associated Work have become the Owner's property, arrange for <br />disposition of these materials as directed. <br />END OF SECTION <br />09/03 01701 -5 03- 4138.A -R <br />