Laserfiche WebLink
DOCUMENT 01720 <br />PROJECT RECORD DOCUMENTS <br />PART 1 -GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Maintain at the site for the Owner one record copy of: <br />1. Drawings <br />2. Specifications <br />3. Addenda <br />4. Change Orders and other Modifications to the Contract <br />5. Engineer's Field Orders or Written Instructions <br />6. Approved Shop Drawings, Working Drawings, and Samples <br />7. Field Test Reports <br />8. Construction Photographs <br />1.02 RELATED REQUIREMENTS <br />A. Section 01050: Field Engineering <br />B. Section 01340: Shop Drawings, Working Drawings and Samples <br />C. Section 01700: Contract Closeout <br />D. Section 01152: Applications for Payment <br />1.03 MAINTENANCE OF DOCUMENTS AND SAMPLES <br />A. Store documents and samples in Contractor's field office apart from <br />documents used for construction. <br />B. File documents and samples in accordance with CSI format number <br />system. <br />C. Maintain documents in a clean, dry, legible condition and in good <br />order. Do not use record documents for construction purposes. <br />D. Make documents and samples available at all times for inspection by <br />the Engineer. <br />09/03 <br />01720 -1 03- 4138.A -R <br />