� I <br />L <br />77 <br />Ll <br />E. As a prerequisite for monthly progress payments, the Contractor is to <br />exhibit the currently updated "record documents" for review by the <br />Engineer and the Owner. <br />1.04 RECORDING <br />A. Label each document "PROJECT RECORD" in neat large printed <br />letters. <br />B. Record information concurrently with construction progress. <br />C. Drawings; Legibly mark record actual construction: <br />1. <br />Depths of various elements of foundation in relation to finish <br />2. <br />first floor datum. <br />All underground piping with elevations and dimensions. <br />Changes to piping location. Horizontal and vertical locations of <br />underground utilities and appurtenances, referenced to <br />permanent surface improvements. Actual installed pipe <br />3. <br />material, class, etc. <br />Location of internal utilities and appurtenances concealed in the <br />construction, referenced to visible and accessible features of the <br />structure. <br />4. <br />Field changes of dimensions and details. <br />5. <br />Changes made by Field Order or by Change Order. <br />6. <br />Details not on original contract drawings. <br />7. <br />Equipment and piping relocations. <br />8. <br />Building and tank locations. <br />D. Specifications <br />and Addenda; legibly mark each Section to record: <br />1. <br />Manufacturer, trade name, catalog number and supplier of each <br />product and item of equipment actually installed. <br />2. <br />Changes made by field order or by Change Order. <br />E. Shop Drawings (after final review and approval): <br />1. One set of record shop drawings for each process equipment, <br />piping, (including casings) electrical system and instrumentation <br />system. <br />F. Certified site survey and line elevations, and stationing at increments <br />per Section 01050, by registered surveyor. <br />1.05 SUBMITTAL <br />09/03 <br />01720 -2 <br />03- 4138.A -R <br />