Laserfiche WebLink
Ll <br />SECTION 01025 <br />MEASUREMENT AND PAYMENT <br />PART 1 -GENERAL <br />1.01 RELATED REQUIREMENTS <br />A. General provisions of Contract, including General and Supplementary <br />Conditions. <br />B. Other Division -1 Specification Sections. <br />1 1.02 SECTION INCLUDES <br />t <br />f <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />A. Administrative and procedural requirements for determining Work <br />completed under unit price contract. <br />1.03 GENERAL REQUIREMENTS <br />A. Lump Sum and unit prices shall include providing all costs required for <br />the complete construction of the specified unit of work including cost <br />of materials and delivery; cost of installation; labor including social <br />security, insurance, and other required fringe benefits; workman's <br />compensation insurance; bond premiums; rental of equipment and <br />machinery; taxes; testing; surveys; incidental expenses; and <br />supervision. <br />B. The Owner reserves the right to reject the Contractor's measurement <br />of completed work that involves use of established unit prices, and to <br />have this Work measured by an independent surveyor acceptable to <br />the Contractor at the Owner's expense. <br />C. Contract Sum adjustments will be by Change Order on basis of net <br />accumulative change for each unit price category. <br />1. Except as otherwise specified, unit prices shall apply to both <br />deductive and additive variations of quantities. <br />2. Lump sum and unit prices in the Agreement shall remain in <br />effect until date of final completion of the entire Work. <br />D. Partial payment for material and equipment properly stored and <br />protected will be made in accordance with requirements of the General <br />Conditions. <br />01025 -1 03- 3148.A <br />