Laserfiche WebLink
t <br />C <br />t <br />w <br />E. Payment will be made at the respective contract unit and lump sum <br />price for each item shown in the Agreement, installed and accepted, <br />which price and payment shall constitute full compensation for <br />furnishing all materials and performing all Work in connection <br />therewith and incidental thereto. <br />1 . No separate payment will be made for: <br />a. Record Drawings <br />b. Construction of haul roads as may be required. <br />C. Testing <br />F. Unit Price Abbreviations: <br />1 . <br />Lineal Feet - LF <br />2. <br />Acre - AC <br />3. <br />Cubic Yard - CY <br />4. <br />Square Yard - SY <br />5. <br />Each - EA <br />6. <br />Lump Sum - LS <br />7. <br />Ton - TN <br />8. <br />Net Mile - NM <br />9. <br />Gross Mile - GM <br />10. <br />Gallons - GA <br />1 1 . <br />Thousand Gallons - MG <br />PART 2 - PRODUCTS (Not applicable) <br />PART 3 - EXECUTION <br />3.01 MEASUREMENT AND PAYMENT <br />A. Electrical <br />1 . Lump Sum <br />2. Maintenance of traffic shall include the cost of barricades, <br />construction signs, flashing arrow boards, and any other <br />miscellaneous devices required to conform with the Manual of <br />Uniform Traffic Control Devices and the current Florida <br />Department of Transportation Roadway and Traffic Design <br />Standards ( "600" Series). Also includes the cost of providing <br />temporary pavement markings indicating lane line and storage <br />areas for turning movements, throughout the project, at the end <br />of each day's operation. <br />B. Contingency: See Specification Section 01021, "Cash Allowances." <br />1710 3, <br />01025 -2 <br />03- 3148.A <br />