Laserfiche WebLink
C. The Project Mobilization <br />1. The project mobilization item shall be administered in <br />accordance with the Florida Department of Transportation, <br />Standard Specifications for Road & Bridge Construction (latest <br />edition); MOBILIZATION. <br />2. The maximum amount allowed for the mobilization and <br />demobilization item shall be five (5) percent of the total contract <br />amount. <br />3. Mobilization includes, but is not limited to, mobilization of <br />equipment, all surveying, all supervision, cost of all bonds and <br />warranties, all permit fees, all insurance and demobilization. <br />3.02 PROTECTION <br />A. Where pavement, trees, shrubbery, fences or other property or surface <br />structures not designated as pay items, have been damaged, removed <br />or disturbed by the Contractor, whether deliberately or through failure <br />to carry out the requirements of the Contract Documents, state laws, <br />municipal ordinances or the specific direction of the Engineer, or <br />through failure to employ usual and reasonable safeguards, such <br />property and surface structures shall be replaced or repaired at the <br />expense of the Contractor to a condition equal to that before work <br />began within a time frame approved by the Engineer. <br />END OF SECTION <br />07/03 01025 -3 03- 3148.A <br />