My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. The Project Mobilization <br />1. The project mobilization item shall be administered in <br />accordance with the Florida Department of Transportation, <br />Standard Specifications for Road & Bridge Construction (latest <br />edition); MOBILIZATION. <br />2. The maximum amount allowed for the mobilization and <br />demobilization item shall be five (5) percent of the total contract <br />amount. <br />3. Mobilization includes, but is not limited to, mobilization of <br />equipment, all surveying, all supervision, cost of all bonds and <br />warranties, all permit fees, all insurance and demobilization. <br />3.02 PROTECTION <br />A. Where pavement, trees, shrubbery, fences or other property or surface <br />structures not designated as pay items, have been damaged, removed <br />or disturbed by the Contractor, whether deliberately or through failure <br />to carry out the requirements of the Contract Documents, state laws, <br />municipal ordinances or the specific direction of the Engineer, or <br />through failure to employ usual and reasonable safeguards, such <br />property and surface structures shall be replaced or repaired at the <br />expense of the Contractor to a condition equal to that before work <br />began within a time frame approved by the Engineer. <br />END OF SECTION <br />07/03 01025 -3 03- 3148.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.