I! <br />' 1.09 STORAGE AND HANDLING OF EQUIPMENT ON SITE <br />A. Because of the long period allowed for construction, special attention <br />shall be given to the storage and handling of equipment on site. As a <br />minimum, the procedure outlined below shall be followed: <br />' 1. Equipment shall not be shipped until approved by the Engineer. <br />The intent of this requirement is to reduce on -site storage time <br />prior to installation and /or operation. Under no circumstances <br />shall equipment be delivered to the site more than one month <br />prior to installation without written authorization from the <br />Engineer unless it is to be stored as specified in Paragraph 1.06 <br />' herein upon arrival. Operation and maintenance data as described <br />in Paragraph 1.08 of Section 01730 shall be submitted to the <br />Engineer for review prior to shipment of equipment. <br />2. All equipment having moving parts such as gears, electric motors, <br />etc. and /or instruments shall be stored in a temperature and <br />humidity controlled building approved by the Engineer, until such <br />time as the equipment is to be installed. <br />3. All equipment shall be stored fully lubricated with oil, grease, etc. <br />' unless otherwise instructed by the manufacturer. <br />4. Manufacturer's storage instructions shall be carefully studied by <br />the Contractor and reviewed with the Engineer by him. These <br />instructions shall be carefully followed and a written record of <br />this kept by the Contractor. <br />5. Moving parts shall be rotated a minimum of once weekly to <br />insure proper lubrication and to avoid metal -to -metal "welding ". <br />Upon installation of the equipment, the Contractor shall start the <br />equipment, at least half load, once weekly for an adequate period <br />I of time to insure that the equipment does not deteriorate from <br />lack of use. <br />6. Lubricants shall be changed upon completion of installation and <br />as frequently as required thereafter during the period between <br />installation and acceptance. Mechanical equipment to be used in <br />the work, if stored for longer than ninety (90) days, shall have <br />' the bearings cleaned, flushed and lubricated prior to testing and <br />start up, at no extra cost to the Owner. <br />7. Prior to acceptance of the equipment, the Contractor shall have <br />the manufacturer inspect the equipment and certify that its <br />condition has not been detrimentally affected by the long storage <br />period. Such certifications by the manufacturer shall be deemed <br />' to mean that the equipment is judged by the manufacturer to be <br />in a condition equal to that of equipment that has been shipped, <br />installed, tested and accepted in a minimum time period. As <br />1 07/03 01600 -7 03- 4138.A <br />