My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />such, the manufacturer will guarantee the equipment equally in <br />both instances. If such a certification is not given, the equipment <br />shall be judged to be defective. It shall be removed and replaced <br />at the Contractor's expense. <br />1.10 WARRANTY <br />A. For all major pieces of equipment, submit a warranty from the <br />equipment manufacturer as specified in Section 01740. <br />1 .1 1 SPARE PARTS <br />A. Spare parts for certain equipment provided under Division 11 through <br />16 have been specified in the pertinent sections of the Specifications. <br />The Contractor shall collect and store all spare parts so required in an <br />area to be designated by the Engineer. In addition, the Contractor shall <br />furnish to the Engineer an inventory listing all spare parts, the equipment <br />' they are associated with, the name and address of the supplier, and the <br />delivered cost of each item. Copies of actual invoices for each item <br />' shall be furnished with the inventory to substantiate the delivered cost. <br />1.12 GREASE, OIL AND FUEL <br />A. All grease, oil and fuel required for testing of equipment shall be <br />furnished with the respective equipment. The Owner shall be furnished <br />with a year's supply of required lubricants including grease and oil of the <br />type recommended b the manufacturer with each item of the equipment <br />supplied under Division 11 through 16. <br />B. The Contractor shall be responsible for changing the oil in all drives and <br />intermediate drives of each mechanical equipment after initial break -in of <br />' the equipment, which in no event shall be any longer than three weeks <br />of operation. <br />IPART 2 - PRODUCTS (Not Used) <br />IPART 3 - EXECUTION (Not Used) <br />IEND OF SECTION <br />1 07/03 01600 -8 03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.