Laserfiche WebLink
18.1 Until final award of Contract, the Owner reserves the right to reject any and <br />all Bids, with or without cause; to waive any informality or irregularity; or to <br />accept the Bid which is in the best interest of the Owner. <br />18.2 It is the intent of the Owner to award a Contract to the lowest responsible <br />Total Base Bidder whose Bid is in conformance with the Bidding Documents <br />and does not exceed the funds available. <br />18.3 Upon acceptance of a Bid and award of the Contract, the successful Bidder <br />shall deliver the executed Contract, along with required bonds and any other <br />items requested, to the Owner within 10 days. Failure to do so will be <br />deemed as a breach of agreement by the Bidder and result in forfeiture of bid <br />security as described in the Instructions to Bidders. <br />18.4 The Owner reserves the right to hold all proposals and bid guarantees for a <br />period not to exceed 90 days after the date of bid opening stated in the <br />Advertisement for Bids. <br />i18.5 The award of the contract, if it is awarded, will be to the lowest responsible <br />total base bidder whose qualifications indicate the award will be to the best <br />interest of the Owner and whose proposal shall comply with the <br />requirements of the Contract Documents. Time is of the essence for this <br />project and the time limits set in the proposal, if set by the bidder, will be <br />accorded weight by the Owner in the determination of the best proposal. In <br />Ino case will the award be made until all necessary investigations have been <br />made into the responsibility of the low bidder and the Owner is satisfied that <br />the bidder is qualified to do the Work and have the necessary organization, <br />Icapital and equipment to carry out the provisions of the contract to the <br />satisfaction of the Owner within the time specified. <br />' 18.7 If the Contractor feels that a problem exists either prior to, or during the bid <br />opening, he shall contact the City (within 24 hours of the bid opening) and <br />follow the Citys' current policy for bid protests. <br />18.8 The Owner reserves the right to award as a total contract any combination <br />of the Unit Price Bid Schedule Items that would be in the best interest of the <br />Owner. <br />19. CASH ALLOWANCES <br />19.1 The Bidder is advised that a space is provided in the Bid Form, Document <br />00300, for this purpose only. The Contractor shall not proceed on any <br />additional work to be covered by allowances until authorized in writing by <br />the Engineer. Such work shall be approved by the Owner, shall be within <br />the scope of work defined by this Contract and shall not exceed the amount <br />1 indicated in the Bid Form. Any amount remaining in the Cash Allowance will <br />be retained by the Owner. <br />END OF DOCUMENT <br />' 07/03 00100 -8 03- 4138.A <br />