My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />D. Stability of Excavations: <br />1. Slope sides of excavations to comply with local codes and <br />ordinances having jurisdiction. <br />2. Shore and brace where sloping is not possible because of space <br />restrictions or stability of material excavated. <br />' 3. Maintain sides and slopes of excavations in safe condition until <br />completion of backfilling. <br />E. Shoring and Bracing: <br />1 <br />1 . Establish requirements for trench shoring and bracing to comply <br />1 <br />with local codes and authorities having jurisdiction. <br />2. Maintain shoring and bracing in excavations regardless of time <br />working room. Provide minimum 6 in. clearance on <br />period excavations will be open. Carry down shoring and <br />1 <br />bracing as excavation progresses. <br />F. Dewatering: <br />1. Excavate trenches to depth indicated or required <br />1. Prevent surface water and subsurface or ground water from <br />flowing into excavations. <br />2. Do not allow water to accumulate in excavations. <br />2. Where rock is encountered, carry excavation <br />3. Provide and maintain pumps, well points, sumps, suction and <br />discharge lines, and other dewatering system components <br />layer of crushed <br />necessary to convey water away from excavations. <br />' <br />t3. <br />G. Stockpile satisfactory excavated materials where directed until <br />P Y <br />indicated depths. <br />required for backfill or fill. Place, grade and shape stockpiles for <br />proper drainage. <br />H. Excavation for Trenches: Dig trenches to the uniform width required <br />1 <br />for particular item to be installed, sufficiently wide <br />to provide ample <br />working room. Provide minimum 6 in. clearance on <br />each side of pipe <br />1 <br />or conduit. <br />1. Excavate trenches to depth indicated or required <br />for indicated <br />flow lines and invert elevations. <br />1 <br />2. Where rock is encountered, carry excavation <br />6 in. below <br />scheduled elevation and backfill with a 6 in. <br />layer of crushed <br />stone or gravel prior to installation of pipe. <br />t3. <br />For pipes or conduit 5 in. or less, excavate to <br />indicated depths. <br />Hand excavate bottom cut to accurate elevations and support <br />1 <br />pipe or conduit on undisturbed soil. <br />4. For pipes or conduit 6 in. or larger, tanks <br />and other work <br />indicated to receive subbase, excavate to <br />subbase depth <br />1 <br />indicated, or, if not otherwise indicated, to 6 <br />in. below bottom <br />of work to be supported. <br />1 <br />07/03 02200 -3 <br />03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.