My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02221 <br />' TRENCHING, BEDDING, AND BACKFILL FOR PIPE <br />PART 1 -GENERAL <br />1.01 WORK INCLUDED <br />' <br />A. <br />Furnish labor, materials, equipment, and incidentals necessary to <br />perform all excavation, backfill, fill, grading and slope protection <br />required to complete the piping work shown on the Drawings and <br />' <br />specified herein. The work shall include, but not necessarily be limited <br />to: manholes, vaults, duct conduit, pipe, and roadways and paving; <br />all bedding, backfilling, fill and required borrow; grading and disposal <br />of surplus and unsuitable materials; and all related work such as <br />sheeting, bracing and water handling. <br />'1.02 <br />RELATED WORK <br />A. <br />Section 02100: Site Preparation <br />B. <br />Section 02220: Structural Excavation, Backfill & Compaction <br />C. <br />Section 02513: Asphaltic Concrete Paving <br />1 1.03 TRENCH PROTECTION <br />A. The Contractor shall construct and maintain sheeting and bracing as <br />required to support the sides of excavations, to prevent any movement <br />which could in any way diminish the width of the excavation below <br />that necessary for proper construction, and to protect adjacent <br />structures, existing piping and foundation material from disturbance, <br />undermining, or other damage. Care shall be taken to prevent voids <br />outside of the sheeting, but if voids are formed they shall be <br />Iimmediately filled and compacted. <br />B. For pipe trench sheeting, no sheeting is to be withdrawn if driven below <br />mid - diameter of any pipe, and no wood sheeting shall be cut off at a level <br />lower than 1 foot above the top of any pipe unless otherwise directed by <br />the Engineer. If during the progress of the work the Engineer decides that <br />' additional wood sheeting should be left in place, he may direct the <br />Contractor in writing. If steel sheeting is used for trench sheeting, <br />removal shall be as specified above, unless written approval is given by <br />' the Engineer for an alternate method of removal. <br />1 07103 02221 -1 03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.