My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.06 <br />B. Following tree spading and /or relocation, trees and palms designated <br />for transplanting shall be watered twice a day for the first two weeks, <br />every two days for the third week to the sixth week following the <br />installed date, every third day for the remainder of the 90 day period, <br />completely saturating the root ball for a period of thirty consecutive <br />days following moving. Such watering shall thoroughly saturate the <br />root ball to its full depth. After ninety day watering period plant <br />materials shall be watered and maintained as according to procedures <br />described for new plant materials, Section 02490. <br />MAINTENANCE <br />A. All relocated plant materials shall be maintained immediately after each <br />item is planted and continued until final inspection and acceptance. <br />B. All relocated plant materials shall be maintained in accordance to <br />procedures described in Section 02490. <br />END OF SECTION <br />07/03 02481-8 03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.