Laserfiche WebLink
G. Inspect all plant material for insect /disease problems. Take appropriate <br />action before loading to ensure all plant material is free of any harmful <br />insect /disease problem. This precaution does not preclude rejection at <br />the site. Apply pesticides in strict accordance with manufacturer's <br />recommendations and all government standards. <br />H. Plant material shall be handled only in ways and means accepted by <br />the industry and approved by the Landscape Architect. <br />I. Plant material shall be planted the same day it is dug. Preparation of <br />planting pits or beds shall be coordinated to ensure this schedule. <br />1 3.02 PLANTING <br />A. Tree Spade Material: <br />1. Plant materials that are tree spaded and are relocated to areas <br />accessible by tree spade equipment shall be planted in tree <br />spaded planting pits as required. <br />2. Plant materials that are tree spaded and are relocated to areas <br />that are not accessible by tree spade equipment shall be planted <br />according to procedures described for new plant materials in <br />Section 02490. <br />3. Contractor shall continue watering and caring for relocated <br />material as described in paragraph 3.04 and as described for <br />new material, Section 02490. <br />B. Hand Dug Material: <br />1. Relocated plant material shall be planted according to <br />procedures described for new material, Section 02490. <br />Additionally, terrasorb shall be added to backfill. <br />2. Contractor shall continue watering and caring for relocated <br />material as described in paragraph 3.04 and as described for <br />new material, Section 02490. Relocated material which does <br />not survive shall be replaced with equal canopy at no cost to <br />the Owner. <br />3.03 FERTILIZER <br />A. Relocated plant materials shall be fertilized immediately after <br />transplanting. <br />B. Fertilizer shall be applied according to procedures described for new <br />materials, 02484 and 02490. <br />3.04 STAKING AND GUYING <br />A. Designated material shall be staked and guyed according to procedures <br />described for new plant materials, Section 02490. <br />3.05 WATERING <br />A. Contractor shall be responsible for the manual watering of relocated <br />plant materials by providing a 90 -day watering program, until they are <br />established. <br />1 07/03 02481-7 03- 4138.A <br />