My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IARTICLE 17 - MISCELLANEOUS <br />17.01 Giving Notice <br />A. Whenever any provision of the Contract Documents <br />requires the giving of written notice, it will be deemed to <br />' have been validly given if delivered in person to the <br />individual or to a member of the firm or to an officer of the <br />corporation for whom it is intended, or if delivered at or sent <br />' by registered or certified mail, postage prepaid, to the last <br />business address known to the giver of the notice. <br />' 17.02 Computation of Times <br />A. When any period of time is referred to in the <br />Contract Documents by days, it will be computed to exclude <br />1 the first and include the last day of such period. If the last <br />day of any such period falls on a Saturday or Sunday or on <br />a day made a legal holiday by the law of the applicable <br />jurisdiction, such day will be omitted from the computation. <br />17.03 Cumulative Remedies <br />' A. The duties and obligations imposed by these General <br />Conditions and the rights and remedies available hereunder <br />to the parties hereto are in addition to, and are not to be <br />construed in any way as a limitation of, any rights and <br />remedies available to any or all of them which are otherwise <br />imposed or available by Laws or Regulations, by special <br />warranty or guarantee, or by other provisions of the Contract <br />Documents, and the provisions of this paragraph will be as <br />effective as if repeated specifically in the Contract <br />Documents in connection with each particular duty, <br />1 obligation. right, and remedy to which they apply. <br />17.04 Survival of Obligations <br />' A. All representations , indemnifications, warranties, <br />and guarantees made in, required by, or given in accordance <br />with the Contract Documents, as well as all continuing <br />obligations indicated in the Contract Documents, will survive <br />final payment, completion, and acceptance of the Work or <br />termination or completion of the Agreement. <br />17.05 Controlling Law <br />A. This Contract is to be governed by the law of the <br />state in which the Project is located. <br />1 00700 -42 <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.