My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Signal Technology
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(03-07-01) SIB Entrance Signs (Electrical)
>
Signal Technology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 6:45:02 AM
Creation date
1/6/2011 11:18:22 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
SIB Entrance Signs (Electrical)
Bid No. (xx-xx-xx)
03-07-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Li <br />J <br />SECTION 00800 <br />SUPPLEMENTARY CONDITIONS <br />The following supplements modify, change from or add to the Standard General Conditions <br />of the Construction Contract, EJCDC Document 1910 -8, 1996 Edition. Where any Article <br />of the General Conditions is modified or any Paragraph, Subparagraph or Clause thereof is <br />modified or deleted by these supplements, the unaltered provisions shall remain in effect. <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br />Add the following sentence to 1.28 Notice of Award: "When requested by OWNER, the <br />Notice of Award may be issued by the ENGINEER." <br />Add the following sentence to 1.29 Notice to Proceed: "When requested by OWNER, the <br />Notice to Proceed may be issued by ENGINEER." <br />Add the following terms after Paragraph 1.50: <br />1.51 ARCHITECT /ENGINEER - The person, firm or corporation named as the ENGINEER in <br />the Agreement. <br />1.52 Provide - As used in the Project Manual, means to furnish and install, complete and <br />ready for intended use. <br />1.53 Product - As used in the Project Manual, includes materials, fabrications, systems and <br />equipment. <br />' 1.54 Project Manual - The volume of written construction documents, including the <br />Bidding Documents, sample forms, and the Contract Documents, such as the Conditions of <br />the Contract and the Specifications. <br />rARTICLE 2 - PRELIMINARY MATTERS <br />t <br />1 <br />Add the following to Paragraph 2.01 .: "If the Work is to be commenced prior to execution <br />of the Agreement in response to a letter of intent, CONTRACTOR shall, prior to <br />commencement of the Work, submit evidence satisfactory to OWNER that such bonds will <br />be furnished." <br />In the first line of Paragraph 2.02., change the term "...ten..." to read "...six... ". <br />Delete Paragraph 2.03. and replace with the following: <br />2.03. The date of commencement of the Work is the date established in a Notice to <br />Proceed. If there is no Notice to Proceed, it shall be the date of the OWNER - <br />CONTRACTOR Agreement or such other date as may be established therein. <br />06/03 00800 -1 03- 4138.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.