Laserfiche WebLink
1 <br />SECTION 00100 <br />INSTRUCTIONS TO BIDDERS <br />1. DEFINITION OF TERMS <br />1.1 Bidding Documents - these include the Advertisement for Bid, Instructions to <br />Bidders, Bid Form, sample bidding and contract forms, proposed Contract <br />Documents as defined in the General Conditions and any Addenda issued prior <br />to receipt of bids. <br />1.2 Total Base Bid - the amount stated on the Bid Form for which the Bidder offers to <br />perform the Work as described in the Bidding Documents. <br />1.3 Unit Price Bid - the amount stated in the Bid Form as a price per unit of <br />measurement for materials or labor as described in the Bidding Documents. <br />1.4 Addenda - written and graphic documents issued by the Engineer prior to the <br />execution of the Contract to modify or interpret the Bidding Documents. <br />2. BIDDING DOCUMENTS <br />2.1 Complete sets of Bidding Documents may be obtained from the office of the <br />Engineer as stated in the Advertisement for Bid. <br />2.2 Complete sets of Bidding Documents shall be used by Bidders in preparation of <br />Bids; neither the Owner nor the Engineer assume any responsibility for errors or <br />misinterpretations resulting from the use of incomplete sets. <br />2.3 Bidding documents consist of this project manual along with the following <br />construction plans titled: <br />a. Seawall Replacement & Restoration <br />C&A Project No. 03 -135 <br />City of Sunny Isles Beach Bid No.04 -01 -01 <br />3. EXAMINATION OF DOCUMENTS AND SITE <br />3.1 Bidders shall visit the site of the proposed work and become familiar with the <br />nature and extent of work to be performed and local conditions that may affect <br />the work. <br />3.2 The Bidding Documents were prepared to present an essentially accurate <br />representation of existing conditions interpreted from available information on the <br />site. The Bidder is not relieved, however, of the responsibility of becoming fully <br />informed as to existing conditions at the site. <br />3.3 Bidders shall examine existing site improvements, and conditions, utilities, and <br />streets to determine all conditions which will affect the Work. <br />RJC 08/03 00100 -1 03 -135 <br />