My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-01-01) Sea Wall Replacement & Restoration
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 12:25:47 AM
Creation date
1/6/2011 11:55:55 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sea Wall Replacement & Restoration
Bid No. (xx-xx-xx)
04-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. <br />4. INTERPRETATION OF BIDDING DOCUMENTS <br />4.1 All questions requiring clarification or interpretation of the Bidding Documents <br />shall be made in writing and shall reach the office of the Owner at least 5 days <br />prior to the date for receipt of bids. Direct all requests to the attention of the <br />Project Engineer at Cutcher & Associates, Inc. (561) 832 -8121 <br />' 4.2 Any modification or interpretation of the Bidding Documents will be made by <br />Addendum to all who are recorded by the Engineer as having received a <br />complete set of Bidding Documents. <br />4.3 Interpretations or modifications of Bidding Documents made in any manner other <br />than by Addendum will not be binding. <br />4.4 A Bidder, prior to submitting his Bid, shall ascertain that he has received all <br />Addenda issued and shall acknowledge their receipt in the Bid Form. <br />5. SUBSTITUTIONS <br />5.1 Bidders represent that their Bid is based upon the materials and equipment <br />described in the Bidding Documents. <br />5.2 Requests for substitutions will be considered prior to receipt of bids if they reach <br />the Engineer at least 5 days prior to the date for receipt of bids. <br />5.3 Acceptance by the Engineer of a proposed substitution will be issued in the form <br />of an Addendum or Substitution Request Form. <br />6. QUALIFICATION OF BIDDERS <br />6.1 If requested, the Bidder shall submit to the Engineer, prior to award of contract, a <br />properly completed Contractors Qualification Statement along with any other <br />evidence of his satisfactory experience and ability to perform the proposed Work. <br />6.2 If requested by the Owner, the Bidder shall submit a certified financial statement, <br />prepared within the past 30 days, indicating current financial resources, liabilities, <br />capital equipment, and past history performance. <br />6.3 Bidders may be disqualified and their bids rejected for any of the following <br />specific reasons: <br />a. Reason to believe that collusion exists among Bidders. <br />b. Determination of lack of competency as may be revealed by qualification <br />statements, financial statements, experience records, or other question- <br />naires. <br />C. The Bidder's uncompleted work load which in the judgement of the <br />Owner, may cause detrimental impact on prompt completion of this <br />project. <br />d. The Bidder is involved in any litigation against the Owner. <br />e. The Bidder has defaulted on any previous contract or is in arrears on any <br />existing contract. <br />RJC 08/03 00100 -2 03 -135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.