My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-01-01) Sea Wall Replacement & Restoration
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 12:25:47 AM
Creation date
1/6/2011 11:55:55 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Sea Wall Replacement & Restoration
Bid No. (xx-xx-xx)
04-01-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -9.4 DELETE THE SECOND AND THIRD SENTENCES OF PARAGRAPH 9.4 OF THE <br />ISTANDARD GENERAL CONDITIONS. <br />ARTICLE .4 — PAYMENT TO CONTRACTOR AND COMPLETION <br />SC -14.1 ADD THE FOLLOWING NEW SUBPARAGRAPHS IMMEDIATELY AFTER <br />' PARAGRAPH 14.1 OF THE STANDARD GENERAL CONDITIONS: <br />14.1.1. There will be only one progress payment and one final payment The progress <br />payment will be made after completion of mobilization, in such amount as is approved by <br />the ENGINEER, in accordance with Article 14 of the Standard General Conditions, not to <br />exceed twenty -five percent (25 %) of the Contract Price. Final payment will be made in <br />accordance with 14.13 of the Standard General Conditions. <br />' 14.1.2. Completion of mobilization, for purposes of the progress payment, shall require <br />that the CONTRACTOR have all needed equipment on site and in operation to the extent <br />of successfully placing a minimum quantity of 1,000 cubic yards of dredge material from <br />the excavation of the sand trap onto the beach within a 24 -hour period. <br />' THE FOLLOWING ARTICLES ARE SUPPLEMENTARY AND SHALL BE IN ADDITION TO <br />THE STANDARD GENERAL CONDITIONS: <br />' ARTICLE 19 — CONFLICTS <br />' SC -19.0 To the extent that there is an express conflict between the Supplemental Conditions of the <br />Standard General Conditions and the remainder of the contract documents, the <br />Supp!emental Conditions of the Standard General Conditions hereto shall prevail. <br />Otherwise, the Supplemental Conditions of the Standard General Conditions are <br />supplementary to the other contract documents. <br />i ARTICLE 22 — CONSTRUCTION SUPERINTENDENT <br />SC -22.0 The CONTRACTOR shall designate, in writing to the ENGINEER, a superintendent and. <br />any necessary assistants satisfactory to the ENGINEER to receive the DISTRICT and <br />ENGINEERS instructions. The Superintendents) shall not be chanced except with the <br />consent of the ENGINEER, unless the Superintendent proves to be unsatisfactory to the <br />CONTRACTOR and ceases to be in his employ. The Superintendent(s) shall follow <br />■ without delay all instructions of the DISTRICT or the ENGINEER or their Resident Project <br />Representative in the prosecution and completion of the work and every part thereof. A <br />j Superintendent must be on the site at all times during project construction or otherwise <br />make himself available to the ENGINEER. <br />ARTICLE 23 — ENGINEER'S SITE VISITS <br />' f SC -23.0 • The ENGINEER may direct the maintenance of the gages, ranges, location, baseline <br />monumentation, marks and limit marks in proper order and position, but the presence of <br />the ENGINEER shall not relieve the CONTRACTOR of responsibility for the proper <br />C -sa <br />
The URL can be used to link to this page
Your browser does not support the video tag.