Laserfiche WebLink
1) Root ends shall be painted with black pruning paint and enclosed in <br />roofing felt for 6 ". Roofing felt shall be securely wired to root. <br />C. New minor scars shall be treated with black pruning paint on day of damage. <br />1.8 RESPONSIBILITY: <br />A. It shall be the responsibility of the CONTRACTOR to provide the physical <br />and /or management measures required to protect trees and plants from <br />damage. <br />B. Damaged trees and /or plants shall be repaired or replaced at <br />CONTRACTOR's expense. <br />2.0 EARTHWORK <br />2.1 SCOPE: <br />A. Work includes excavation, backfill, compaction, grading and related work as <br />indicated on Drawings and specified herein. <br />B. Clearing and disposal is specified in Site Preparation. <br />C. Tree and plant protection is specified in Site Preparation. <br />2.2 EXISTING CONDITIONS: <br />Drawings indicate known underground utilities and /or construction elements <br />at locations where it is anticipated that they may interfere with construction of <br />this project. The CONTRACTOR is to verify location of utilities before <br />excavation is to commence. <br />TS -3 <br />RJV0aWSUNNY ISLES/TECHSPECS <br />