My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 04-04-01 Structured Cabling System
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:21:45 AM
Creation date
1/6/2011 2:16:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Structured Cabling System
Bid No. (xx-xx-xx)
04-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Category 6 Cabling System City of Sunny Isles Beach <br />Request for Proposal Confidential and Proprietary <br />10 INSTALLATION <br />10.1 SITE SURVEY <br />Prior to placing any cable pathways or cable, the contractor shall survey the site to determine job <br />conditions will not impose any obstructions that would interfere with the safe and satisfactory <br />placement of the cables. The arrangements to remove any obstructions with the Project Manager <br />need to be determined at that time. <br />10.2 PHYSICAL INSTALLATION <br />10.2.1 CABLE PATHWAYS <br />■ Pathways shall be designed and installed to meet applicable local and national building and <br />electrical codes or regulations. <br />• Grounding / Earthing and bonding of pathways shall comply with applicable codes and <br />regulations. <br />• Pathways shall not have exposed sharp edges that may come into contact with <br />telecommunications cables. <br />• The number of cables placed in a pathway shall not exceed manufacture specifications, nor, <br />will the geometric shape of a cable be affected. <br />• Pathways shall not be located in elevator shafts. <br />10.2.2 INTRABUILDING CABLE ROUTING <br />■ The backbone subsystem shall include cable installed in a vertical manner between floor <br />telecommunications rooms and the main or intermediate cross - connect in a multi -story <br />building and cable installed horizontally between telecommunications rooms and the main or <br />intermediate cross - connect in a long single story building like a school or factory. <br />■ Unless otherwise recommended by the manufacturer, all fiber cables will be run in inner duct. <br />■ Fibers will be terminated in the telecommunications rooms using SC, or FC connectors in <br />wall mounted interconnect centers or rack mounted panels equipped with sufficient ports, <br />slack storage space and splice trays if required to terminate and secure all fibers. <br />• Adequate riser sleeve /slot space shall be available with the ability to ingress the area at a later <br />date in all telecommunications rooms, such that no drilling of additional sleeves /slots is <br />necessary. <br />• The backbone cables shall be installed in a star topology, emanating from the main cross - <br />connect to each telecommunications room. An intermediate cross - connect may be present <br />between the main cross - connect and the horizontal cross - connect. This is known as a <br />hierarchical star topology. <br />• Optical fiber should be run for any backbone segment greater than 90 m (295 ft.). If the <br />Intrabuilding backbone segment is less than 90 m (295 ft), and fiber is not routed, the <br />balanced twisted -pair cable shall be category 5e or higher. <br />• Backbone pathways shall be installed or selected such that the minimum bend radius of <br />backbone cables is kept within manufacturer specifications both during and after installation. <br />• In an underground system, adequate underground conduit space shall be available and <br />accessible at each building. The conduits shall not exceed a fill factor of 40 %. <br />■ All underground systems shall be designed to prevent water runoff from entering the building. <br />■ The backbone cables shall be installed in a star topology, emanating from the main cross - <br />connect to each satellite building telecommunications room. All Interbuilding cables shall be <br />installed to the applicable codes and regulations. <br />10.2.3 HORIZONTAL CABLE ROUTING <br />■ All horizontal cables, regardless of media type, shall not exceed 90 m (295 ft) from the <br />telecommunications outlets in the work area to the horizontal cross connect. <br />
The URL can be used to link to this page
Your browser does not support the video tag.