My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 04-04-01 Structured Cabling System
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:21:45 AM
Creation date
1/6/2011 2:16:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Structured Cabling System
Bid No. (xx-xx-xx)
04-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Category 6 Cabling System City of Sunny Isles Beach <br />Request for Proposal Confidential and Proprietary <br />• The combined length of jumpers, or patch cords and equipment cables in the <br />telecommunications room and the work area should not exceed 10m (33 ft) unless used in <br />conjunction with a multi -user telecommunications outlet. <br />• Two horizontal cables shall be routed to each work area. At least one horizontal cable <br />connected to an information outlet shall be 4 -pair, 100 Q balanced twisted -pair. <br />• It is recommended that a minimum horizontal cable distance of 15m (49 ft.) shall be <br />maintained between the telecommunications room and the work area. <br />• Horizontal pathways shall be installed or selected such that the minimum bend radius of <br />horizontal cables is kept within manufacturer specifications both during and after installation. <br />• In open ceiling cabling, cable supports shall be provided by means that is structurally <br />independent of the suspended ceiling, its framework, or supports. These supports shall be <br />spaced no more than 1.5 m (5 ft) apart. <br />• Telecommunications pathways, spaces and metallic cables, which run parallel with electric <br />power or lighting, which is less than or equal to 480 Vrms, shall be installed with a minimum <br />clearance of 50 mm (2 in). <br />• The installation of telecommunications cabling shall maintain a minimum clearance of 3 m (10 <br />ft) from power cables in excess of 480 Vrms. <br />• No telecommunications cross - connects shall be physically located within 6 m (20 ft) of <br />electrical distribution panels, step down devices, or transformers, which carry voltages in <br />excess of 480 Vrms. <br />• For voice or data applications, 4 -pair balanced twisted -pair or fiber optic cables shall be run <br />using a star topology from the telecommunications room serving that floor to every individual <br />information outlet. The customer prior to installation of the cabling shall approve all cable <br />routes. <br />• The Contractor shall observe the bending radius and pulling strength requirements of the <br />4 -pair balanced twisted -pair and fiber optic cable during handling and installation. <br />• Each run of balanced twisted -pair cable between horizontal portions of the cross - connect in <br />the telecommunication closet and the information outlet shall not contain splices. <br />• In a false ceiling environment, a minimum of 3 inches (75 mm) shall be observed between the <br />cable supports and the false ceiling. <br />• Continuous conduit runs installed by the contractor should not exceed 30.5 m (100 ft) or <br />contain more than two (2) 90 degree bends without utilizing appropriately sized pull boxes. <br />• All horizontal pathways shall be designed, installed and grounded to meet applicable local and <br />national building and electrical codes. <br />• Maximum conduit pathway capacity shall not exceed a 40% fill. However, perimeter and <br />furniture fill is limited to 60% fill for move and changes. <br />• Horizontal distribution cables shall not be exposed in the work area or other locations with <br />public access. <br />• Cables routed in a suspended ceiling shall not be draped across the ceiling tiles. Cable <br />supports shall be mounted a minimum of 75 mm (3 in) above the ceiling grid supporting the <br />tiles. <br />10.2.4 WORK AREA TERMINATION <br />■ All balanced twisted -pair cables wired to the telecommunications outlet/connector, shall have <br />4 -pairs terminated in eight - position modular outlets in the work area. All pairs shall be <br />terminated using a EIA/TIA 568 -b Wiring Scheme. <br />■ The telecommunications outlet/connector shall be securely mounted at planned locations. <br />■ The height of the telecommunications faceplates shall be to applicable codes and regulations. <br />10.2.5 PULLING TENSION <br />■ The maximum cable pulling tensions shall not exceed manufacturer's specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.