My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 04-04-01 Structured Cabling System
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:21:45 AM
Creation date
1/6/2011 2:16:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Structured Cabling System
Bid No. (xx-xx-xx)
04-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Category 6 Cabling System City of Sunny Isles Beach <br />Request for Proposal Confidential and Proprietary <br />1.3 INSTRUCTIONS TO THE BIDDER <br />Bids shall be valid for 90 days. <br />The Bidder shall consider the nature and amount of work to be done as well as the difficulties involved <br />in its proper execution. <br />No bid will be accepted by any contractor who did not attend the scheduled mandatory site survey, <br />unless this requirement is waived by the City. <br />The bid shall include all costs deemed necessary to cover all contingencies essential to the installation <br />of the specified system. <br />Total cost for installation materials, labor project management, permit fees, taxes and other <br />miscellaneous items must be listed separately. <br />A complete materials list, including description, manufacturer, part number, quantity, unit price and <br />total price must also be included. <br />All products and materials shall be new, clean, free of defects and free of damage and corrosion. <br />Where discrepancies are found during the bid process, the most stringent requirements must be <br />included in the bid. <br />Any cost encountered, which is not specifically itemized in the bid, shall not be incurred unless <br />specifically agreed upon, in writing. <br />No additional compensation will be allowed for extra work incurred on the part of the Contractor due to <br />the contractor's failure to notice any existing condition, which may cause the additional labor. <br />Bid responses shall be concise following the format and numbering of this specification. Items not <br />requiring responses shall be acknowledged by the bidder as being understood. <br />Bidders must notify the Purchaser as soon as detected any omissions or errors in the specification so <br />corrective addenda may be issued. Such notification must be received by the Purchaser at least (10) <br />days prior to the date for receipt of bids. <br />Sealed bids will be accepted by the City Clerk at City Hall (17070 Collins Avenue Suite 250, Sunny <br />Isles Beach, FL 33160) by the deadline listed in section 1.5 below. Bids received after the deadline <br />will be returned unopened. <br />Inquiries and requests for clarifications should be submitted to Derrick Arias, IT Director, in writing at <br />17070 Collins Avenue, Suite 250, Sunny Isles Beach, FL 33160 by the deadline listed in section 1.5 <br />below. <br />1.4 RIGHTS OF THE PURCHASER <br />The Purchaser reserves the right to accept any bid or, at its sole discretion, reject any or all bids for <br />whatever reason it deems appropriate. <br />The Purchaser reserves the right to purchase ALL or PART of the cabling materials and hardware <br />needed for the project. <br />Receipt of a bid response does not obligate the Purchaser to pay any expenses incurred by the bidder <br />in preparation of the bid response or obligate the Purchaser in any other respect. <br />The Purchaser reserves the right to modify the specifications contained in the Request for Quote at <br />any time during the bidding period. <br />Only changes issued as an addendum will be binding upon the Purchaser. No verbal instructions or <br />interpretations of requirements shall be accepted. <br />1.5 SCHEDULE OF EVENTS <br />The schedule below indicates the critical dates that must be satisfied by the Contractor. The <br />Contractor must staff its work crews appropriately to meet the required dates of completion. The <br />Contractor shall also have staff available to provide coverage during the cut over period of ( 2) days. <br />■ RFP issue 4/12/2004 <br />■ Pre -bid conference <br />4/26/2004 <br />■ Proposal due <br />5/3/2004 <br />■ Contract Award <br />5/20/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.