Laserfiche WebLink
Category 6 Cabling System City of Sunny Isles Beach <br />Request for Proposal Confidential and Proprietary <br />5 SCOPE OF WORK <br />The proposed Cabling System is to be a Category 6 fully compliant & operating system. <br />5.1 COPPER BACKBONE CABLING <br />Copper backbone cabling shall consist of 100 /50 pair Category 5e riser rated copper cable. <br />Contractor will install a total of (100) pairs of copper cable between MPOE 1 -022 (demark) & the <br />MDF on the 3 d floor, 100 airs of copper cable between MPOE 1 -022 (demark) & the PD <br />Computer room 2 -020 on the 2 nd floor, (100) pairs of copper cable between PD Computer room 2- <br />020 & the MDF on the 3`d floor, (50) pairs of copper cable between TELCO CLOSET 2 -009 & the <br />MDF on the 3rd floor, (50) pairs of copper cable between TELCO CLOSET 3 -009 & the MDF on the <br />3`d floor, (50) pairs of copper cable between TELCO CLOSET 4 -009 & the MDF on the 3`d floor, & <br />50 airs of copper cable between TELCO CLOSET 1 -037 (council chambers) & the MDF on the 3rd <br />floor. The Backbone cables will be terminated onto 300 pair 110 termination blocks. The contractor <br />will then install tails from the blocks onto 96 port Cat 5e Patch panels to facilitate patching of <br />extensions by customer Telecom Personnel. Pair terminations will be 1 pair per port on panels. All <br />necessary wire management shall be installed for a complete system. <br />5.2 CATEGORY 6 HORIZONTAL CABLING <br />All outlets shall consist of Quad (4) Category 6 Plenum cables installed onto RJ -45 category 6 Outlets. <br />All cable is to be bundled neatly in the ceiling with the use of J- hooks. All cable will be terminated onto <br />48 port Patch panels in the appropriate IDF. Yellow patch cables shall be provided for port (4) of <br />every location, of sufficient length to connect to data switch at proposed location (as shown in <br />diagrams — see section 14 of the RFP). Orange patch cables shall be provided for port (3) of every <br />location, of sufficient length to connect to data switch at proposed location (as shown in diagrams — <br />see section 14 of this RFP). <br />5.3 CLOSET TERMINATION <br />All IDF closets will be fitted with (1) 19 "x7' Data Racks. All Horizontal cables will terminate onto 48 <br />port Category 6 patch panels. It is the contractor's responsibility to provide sufficient panels & wire <br />management hardware for a complete system. Racks will be equipped with horizontal & vertical cable <br />management as well as ladder rack for a complete system. All racks to be supplied by contractor <br />Cabinets to be provided by Customer. <br />5.4 WORK AREA <br />All data outlets shall be supplied with two (2) 10 foot patch category 6 patch cables, one yellow color <br />and one gray color. <br />5.5 FIBER BACKBONE <br />Fiber backbone cabling shall consist of 12 strands of multimode (62.5/125 um) plus 6 strands of <br />single mode (9/125 um) fiber. Contractor will install fiber backbone between the PD Computer Room <br />2 -020 and the MDF on the 3`d floor, between the telco closet 2 -009 and the MDF on the 3rd floor, <br />between the telco closet 4 -009 and the MDF on the 3rd floor, and between the telco closet 1 -037 <br />(council chambers) and the MDF on the 3rd floor. In addition, contractor shall supply fiber patch <br />cables for each endpoint as follows: <br />■ Telco closet 4 -009 : (2) SC -LC 2 meter patch cables <br />• Telco closet 2 -009: (2) SC -LC 2 meter patch cables <br />• Telco closet 1 -037: (2) SC -LC 2 meter patch cables <br />• PD Computer Room : (2) SC -LC 2 meter patch cables <br />• MDF : (8) SC -LC 2 meter patch cables <br />