My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jade Communications, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 04-04-01 Structured Cabling System
>
Jade Communications, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 10:17:23 PM
Creation date
1/6/2011 2:41:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Structured Cabling
Bid No. (xx-xx-xx)
04-04-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />Category 6 Cabling System City of Sunny Isles Beach <br />Request for Proposal Confidential and Proprietary <br />5 SCOPE OF WORK <br />The proposed Cabling System is to be a Category 6 fully compliant & operating system. <br />5.1 COPPER BACKBONE CABLING <br />Copper backbone cabling shall consist of 100 /50 pair Category 5e riser rated copper cable. <br />Contractor will install a total of (100) pairs of copper cable between MPOE 1 -022 (demark) & the <br />MDF on the 3rd floor, 100 airs of copper cable between MPOE 1 -022 (demark) & the PD <br />Computer room 2 -020 on the 2" floor, (100) pairs of copper cable between PD Computer room 2- <br />020 & the MDF on the 3rd floor, (50) pairs of copper cable between TELCO CLOSET 2 -009 & the <br />MDF on the 3`d floor, 50 airs of copper cable between TELCO CLOSET 3 -009 & the MDF on the <br />3rd floor, 50 airs of copper cable between TELCO CLOSET 4 -009 & the MDF on the 3rd floor, & <br />50 airs of copper cable between TELCO CLOSET 1 -037 (council chambers) & the MDF on the <br />3r floor. The Backbone cables will be terminated onto 300 pair 110 termination blocks. The <br />contractor will then install tails from the blocks onto 96 port Cat 5e Patch panels to facilitate patching <br />of extensions by customer Telecom Personnel. Pair terminations will be 1 pair per port on panels. <br />All necessary wire management shall be installed for a complete system. <br />5.2 CATEGORY 6 HORIZONTAL CABLING <br />I All outlets shall consist of Quad (4) Category 6 Plenum cables installed onto RJ-45 category 6 <br />Outlets. All cable is to be bundled neatly in the ceiling with the use of J- hooks. All cable will be <br />terminated onto 48 port Patch panels in the appropriate IDF. Yellow patch cables shall be provided <br />' for port (4) of every location, of sufficient length to connect to data switch at proposed location (as <br />shown in diagrams — see section 14 of the RFP). Orange patch cables shall be provided for port (3) <br />of every location, of sufficient length to connect to data switch at proposed location (as shown in <br />diagrams — see section 14 of this RFP). <br />5.3 CLOSET TERMINATION <br />All IDF closets will be fitted with (1) 19 "x7' Data Racks. All Horizontal cables will terminate onto 48 <br />port Category 6 patch panels. It is the contractor's responsibility to provide sufficient panels & wire <br />management hardware for a complete system. Racks will be equipped with horizontal & vertical <br />cable management as well as ladder rack for a complete system. All racks to be supplied by <br />contractor Cabinets to be provided by Customer. <br />' 5.4 WORK AREA <br />All data outlets shall be supplied with two (2) 10 foot patch category 6 patch cables, one yellow color <br />and one gray color. <br />5.5 FIBER BACKBONE <br />Fiber backbone cabling shall consist of 12 strands of multimode (62.5/125 um) plus 6 strands of <br />single mode (9/125 um) fiber. Contractor will install fiber backbone between the PD Computer Room <br />2 -020 and the MDF on the 3rd floor, between the telco closet 2 -009 and the MDF on the 3`d floor, <br />between the telco closet 4 -009 and the MDF on the 3rd floor, and between the telco closet 1 -037 <br />(council chambers) and the MDF on the 3rd floor. In addition, contractor shall supply fiber patch <br />cables for each endpoint as follows: <br />■ Telco closet 4 -009: (2) SC -LC 2 meter patch cables <br />■ Telco closet 2 -009 : (2) SC -LC 2 meter patch cables <br />■ Telco closet 1 -037. (2) SC -LC 2 meter patch cables <br />■ PD Computer Room: (2) SC -LC 2 meter patch cables <br />■ <br />MDF: (8) SC -LC 2 meter patch cables <br />
The URL can be used to link to this page
Your browser does not support the video tag.