My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jade Communications, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 04-04-01 Structured Cabling System
>
Jade Communications, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 10:17:23 PM
Creation date
1/6/2011 2:41:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Structured Cabling
Bid No. (xx-xx-xx)
04-04-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Which sheets should vendors receive from Miami T- square when they pick up the <br />architectural drawings (see section 14.20 of the RFP)? <br />The following electrical sheets: <br />i. E.2.311 <br />ii. E.2.312 <br />E.2.321 <br />iv. E.2.322 <br />v. E.2.331 <br />vi. E.2.341 <br />vii. E.0.100 (legend) <br />viii. E.0300 (additional notes) <br />In addition, the following are the final furniture plan sheets which you <br />may refer to if desired: <br />i. A.2.510 <br />ii. A.2.511 <br />iii. A.2.520 <br />iv. A.2.530 <br />v. A.2.540 <br />8, Is there a bond requirement? <br />➢ No, there is no bond requirement. <br />9. The RFP specifies Belden cable. Can another cable manufacturer be substituted <br />in order to meet the manufacturer warranty requirements for the installation? <br />Yes, equivalent cable may be substituted to meet the manufacturer <br />warranty requirements. <br />10. In the RFP document, diagram 14.2 shows 38 locations on the 4t' floor, while <br />diagram 14.8 shows 40 locations on the 4 "' floor. Which is correct? <br />➢ Diagram 14.2 is correct. There are 38 locations on the 4th floor. <br />11. What is the property address? <br />r 18070 Collins Avenue, Sunny Isles Beach. <br />12. Who should be contacted to obtain the architectural drawings (see section 14.20 <br />of the RFP) <br />Contact the Coral Gables office of Miami T- square at 305.446.8816 and <br />speak with Helmutt, Victoria, or Lucius. If you have any problems obtaini <br />ng the plans please contact the Architect directly — Larry Kline at <br />305.447.3574. <br />13. What is the deadline for bid submission? <br />All sealed bids must be received by the City Clerk by 10:00 AM on May <br />3, 2004. <br />14. Can Mohawk cable be used for this project? <br />See question 49. <br />15. RFP section 6.1 specifies 6 port faceplates, but all locations are be run with 4 <br />cables with the exception of the I" floor conference room locations which contain <br />6 cables. Should 4 -port faceplates be used for locations with 4 cables? <br />y Yes, 4 or 6 port faceplates should be used as appropriate. <br />16. Will the copper and fiber optic riser cables be run within continuous conduit from <br />the Computer Room 93 -016 to the telco closets, alleviating the need for plenum <br />
The URL can be used to link to this page
Your browser does not support the video tag.