My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jade Communications, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 04-04-01 Structured Cabling System
>
Jade Communications, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 10:17:23 PM
Creation date
1/6/2011 2:41:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Structured Cabling
Bid No. (xx-xx-xx)
04-04-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />rated cable / innerduct? Or will the cables be run through sleeves through <br />theplenum, thus requiring plenum rated cable / innerduct? <br />See questions #4 and #5 above. <br />Is there a specific grade of glass you require for the multimode fiber optic cable? <br />Are you trying to achieve 1 Gigabit throughput? <br />No, we do not require any specific grade of glass for the multimode or <br />single mode fiber. <br />Specifically, how many Category 6 patch cords are required in each color & at <br />what lengths? <br />As specified in section 5.4, two (2) patch cables are to be supplied for each <br />work area, one yellow and one gray, each ten (10) feet in length. Based can <br />the location counts in figure 14.2, there are a total of 177 locations in the <br />building. Therefore, 177 yellow 10 ft. patch cords and 177 gray 10 ft. <br />patch cords must be supplied for the work areas. In addition, section 5.2 <br />of the RFP specifies yellow and orange patch cords to be provided for <br />each closet where the work area cabling (horizontal cabling) terminates. <br />Vendor must determine the correct length at installation based on vendor's <br />design, as specified in section 5.2, but the quantities will be 177 yellow <br />and 177 orange patch cords. <br />Do you require front and rear horizontal wire management panels? <br />� Yes, front and rear panels must be provided. <br />For quotation purposes, are we to base the number of outlets according to the <br />counts listed on the Horizontal Riser diagram (14.2) or shall we come up with <br />totals based on triangle counts on each power plan? <br />w For quotation purposes, base location counts on the Horizontal Riser <br />diagram (14.2) in the RFP document. Ideally, vendors will provide an <br />additional "per location" quote in their bid submission should the City <br />require any additional locations. <br />Do wall phone only locations receive four (4) cables or just one (1)? <br />r For quotation purposes, base number of locations and cable counts on the <br />riser diagram (14.2) rather than the electrical drawing sheets. <br />Who will be responsible for providing and installing the plywood backboards? <br />The plywood backboards will be provided and installed by the General <br />Contractor prior to work commencement on the structured cabling system. <br />Is it correct to assume that all conduit(s), poke through fittings, and sleeves will <br />be provided by the electrical contractor? <br />Yes, all conduit(s), poke through fittings, and sleeves (as shown on <br />architectural drawings [see section 14.20 of the RFP]) will be provided by <br />the General Contractor prior to work commencement on the structured <br />cabling system. <br />24. Can another manufacturer of rack equipment be substituted instead of <br />Chatsworth? <br />Yes, equivalent equipment may be substituted. <br />25. Will the bid due date be extended for this project? <br />No, see question 9 13 above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.