My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jade Communications, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 04-04-01 Structured Cabling System
>
Jade Communications, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2012 10:17:23 PM
Creation date
1/6/2011 2:41:33 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Structured Cabling
Bid No. (xx-xx-xx)
04-04-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26. Sheet E.0.100— the V/D symbols do not note how many CAT6 cables are at each <br />outlet. <br />See question #20 above. <br />27. Should all CAT6 cable to a particular faceplate be one color or if not state which <br />color should be in what position of the particular faceplate? <br />r As depicted in figures 14.4, 14.6, 14.8, 14.10, 14. 11, and 14.15, four <br />CAT6 cables, one each of white, black, yellow, and orange color, shall be <br />run to each location. The specific arrangement of each outlet shall be <br />determined prior to work commencement and is not expected to have any <br />bearing on bidders response to the RFP. <br />28. Should all the CAT6 jacks in a particular faceplate be one color or if not state <br />which color should be in what position of the particular faceplate? <br />Y Jacks should be of matching color with the cable connected to each <br />particular jack. Therefore, each faceplate shall have four jacks, one each <br />of white, black, yellow, and orange color. The only exception shall be the <br />additional two jacks located in the first floor conference room (see also <br />questions 46 and #15 above), which shall be of different colors (color #5 <br />and Color #6) to be determined. <br />29. Specification section 14.2 Horizontal cabling — the count of the station drops do <br />not match actual count on the floor plans. <br />Refer to questions #20 and #26 above. <br />30. How are we to determine the third floor locations which ones are PD and NON - <br />PD with the locations terminating in two different closets? The same for the I" <br />and 2nd floor? <br />y The third floor of the building is physically divided into two sections, <br />separated by an access - controlled doorway. The area of the second floor <br />West of the doorway will be part of the Police Department, and all <br />locations in this area shall be home -run to the PD Computer Room. A1.1 <br />' locations in the area East of the doorway shall be home -run to the main <br />computer room. The entire second floor of the government center shall be <br />dedicated to the Police Department, and all locations on the second floor <br />' shall be home -run to the PD Computer Room. The only area on the first <br />floor that will also be home -run to the PD Computer Room is a single <br />conference room (eight locations), room number 1 -019. <br />' 31. Are the CAT6 cables from one particular location being separated on patch panels <br />in the Computer Room(s) / Telco closets? <br />Yes, all 4 cables from each particular location shall be run to different <br />patch panels as indicated in drawings 14.4, 14.6, 14.8, 14. 10, 14. 11, and <br />14.15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.