My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications & Add.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-05-01) Samson O. Pk Landsc. & Lighting
>
Specifications & Add.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:18:23 AM
Creation date
1/7/2011 10:22:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson O. Pk. Lands. & Lighting
Bid No. (xx-xx-xx)
04-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />17.5 In the event of a timely protest, the City Manager or his /her designee shall <br />stay the award of the contract unless, after consulting with the City <br />Attorney and the affected director, he /she determines that the award of the <br />contract without delay is necessary to protect substantial interests of the <br />city. <br />17.6 The city shall require a deposit from a protester to compensate the City for <br />the expenses of administering the protest. If the protest is decided in the <br />protester's favor, the entire deposit shall be returned to the protester. If the <br />protest is not decided in the protester's favor, the deposit shall be forfeited <br />to the city. The deposit shall be in the form of a cashier's check and shall be <br />in the amount of 1 % of the amount of the pending award, with a minimum <br />deposit of $500 and a maximum deposit of $10,000. <br />18. CONTRACT AWARD AND EXECUTION <br />18.1 Until final award of Contract, the Owner reserves the right to reject any and <br />all Bids, with or without cause; to waive any informality or irregularity; or to <br />accept the Bid which is in the best interest of the Owner. <br />18.2 It is the intent of the Owner to award a Contract to the lowest responsible <br />Total Base Bidder whose Bid is in conformance with the Bidding Documents <br />and does not exceed the funds available. <br />' 18.3 Upon acceptance of a Bid and award of the Contract, the successful Bidder <br />shall deliver the executed Contract, along with required bonds and any other <br />items requested, to the Owner within 10 days. Failure to do so will be <br />' deemed as a breach of agreement by the Bidder and result in forfeiture of bid <br />security as described in the Instructions to Bidders. <br />18.4 The Owner reserves the right to hold all proposals and bid guarantees for a <br />period not to exceed 90 days after the date of bid opening stated in the <br />Advertisement for Bids. <br />18.5 The award of the contract, if it is awarded, will be to the lowest responsible <br />total base bidder whose qualifications indicate the award will be to the best <br />' interest of the Owner and whose proposal shall comply with the <br />requirements of the Contract Documents. Time is of the essence for this <br />project and the time limits set in the proposal, if set by the bidder, will be <br />' accorded weight by the Owner in the determination of the best proposal. In <br />no case will the award be made until all necessary investigations have been <br />made into the responsibility of the low bidder and the Owner is satisfied that <br />the bidder is qualified to do the Work and have the necessary organization, <br />capital and equipment to carry out the provisions of the contract to the <br />satisfaction of the Owner within the time specified. <br />18.7 If the Contractor feels that a problem exists either prior to, or during the bid <br />opening, he shall contact the City (within 24 hours of the bid opening) and <br />' follow the Citys' current policy for bid protests. <br />05104 00100 -8 03 -4465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.