My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications & Add.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-05-01) Samson O. Pk Landsc. & Lighting
>
Specifications & Add.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:18:23 AM
Creation date
1/7/2011 10:22:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson O. Pk. Lands. & Lighting
Bid No. (xx-xx-xx)
04-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f' <br />1-1 <br />t <br />L <br />t <br />1 <br />1 <br />1 <br />EJCDC <br />STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR <br />ON THE BASIS OF A STIPULATED PRICE <br />THIS AGREEMENT is dated as of the <br />between CITY OF SUNNY ISLES BEACH <br />hereinafter called CONTRACTOR). <br />day of in the year 20 <br />(hereinafter called OWNER) and <br />by and <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as <br />follows: <br />Article 1. WORK. <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The <br />Work is generally described as follows: <br />Sunny Isles Sampson Oceanfront Park Landscape Lighting Improvements <br />Article 2. ENGINEER. <br />The Project has been designed by: CALVIN, GIORDANO & ASSOCIATES, INC. <br />1800 Eller Drive, Suite 600 <br />Fort Lauderdale, Florida 33316 <br />who is hereinafter called ENGINEER and who is to act as OWNER'S representative, assume all duties <br />and responsibilities and have the rights and authority assigned to ENGINEER in the Contract <br />Documents in connection with completion of the Work in accordance with the Contract Documents. <br />Article 3. CONTRACT TIMES. <br />3.1. The work will be substantially completed within 150 days after the date when the <br />Contract Times commence to run as provided in paragraph 2.3 of the General Conditions, and <br />completed and ready for final payment in accordance with paragraph 14.07 of the General <br />Conditions within 150 days after the date when the Contract Times commence to run. <br />3.2. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the <br />essence of this Agreement and that OWNER will suffer financial loss if the Work is not <br />completed within the times specified in paragraph 3.1 above, plus any extensions thereof <br />allowed in accordance with Article 12 of the General Conditions. They also recognize the <br />delays, expense and difficulties involved in proving the actual loss suffered by OWNER if the <br />Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and <br />CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) <br />CONTRACTOR shall pay OWNER Five Hundred and 00/100 dollars ($500.00) for each day <br />that expires after the time specified in paragraph 3.1 for Substantial Completion until the Work <br />is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse <br />or fail to complete the remaining Work within the time specified in paragraph 3.1 for <br />completion and readiness for final payment or any proper extension thereof granted by <br />OWNER, CONTRACTOR shall pay OWNER Five Hundred 00/100 dollars ($500.00) for each <br />day that expires after the time specified in paragraph 3.1 for completion and readiness for final <br />payment. <br />00500 -1 <br />03 -4465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.