My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications & Add.#1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-05-01) Samson O. Pk Landsc. & Lighting
>
Specifications & Add.#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 1:18:23 AM
Creation date
1/7/2011 10:22:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Samson O. Pk. Lands. & Lighting
Bid No. (xx-xx-xx)
04-05-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />Article 4. CONTRACT PRICE. <br />OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract <br />Documents an amount in current funds equal to the sum of the amounts determined pursuant to <br />paragraphs 4.1 and 4.2 below: <br />4.1. for all Work other than Unit Price Work, a Lump Sum of: N/A <br />(use words) <br />IS ) <br />figures <br />All specific cash allowances are included in the above price and have been computed in <br />accordance with paragraph 11 .02 of the General Conditions; <br />plus <br />4.2. for all Unit Price Work, an amount equal to the sum of the established unit price for <br />each separately identified item of Unit Price Work times the estimated quantity of that item as <br />indicated in this paragraph 4.2: <br />UNIT PRICE WORK <br />ESTIMATED <br />NO. ITEM UNIT QUANTITY <br />Refer to Exhibit "A" ( -) <br />ITOTAL OF ALL UNIT PRICES <br />17 <br />LJ <br />I] <br />r7 <br />LI <br />c <br />UNIT TOTAL <br />PRICE ESTIMATED <br />As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, <br />and determinations of actual quantities and classification are to be made by ENGINEER as provided in <br />paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph <br />11 .03.6 of the General Conditions. <br />Article 5. PAYMENT PROCEDURES. <br />CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General <br />Conditions. Applications for Payment will be processed by ENGINEER as provided in the General <br />Conditions. <br />5.1. Progress Payments; Retainage. OWNER shall make progress payments on account of <br />the contract Price on the basis of CONTRACTOR's Applications for Payment as recommended <br />by ENGINEER, on or about the last day of each month during construction as provided in <br />paragraphs 5.1.1. and 5.1.2. below. All such payments will be measured by the schedule of <br />values established in paragraph 2.07 of the General Conditions (and in the case of Unit Price <br />Work based on the number of units completed) or, in the event there is no schedule of values, <br />as provided in the General Requirements. <br />05/04 00500 -2 <br />03 -4465 <br />
The URL can be used to link to this page
Your browser does not support the video tag.