Laserfiche WebLink
<br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1 . No separate payment will be made for: <br />a. Record Drawings <br />b. Construction of haul roads as may be required. <br />c. Testing <br /> <br />F. Unit Price Abbreviations: <br /> <br />1. Lineal Feet - LF <br />2. Acre - AC <br />3. Cubic Yard - CY <br />4. Square Yard - SY <br />5. Each - EA <br />6. Lump Sum - LS <br />7. Ton - TN <br />8. Net Mile - NM <br />9. Gross Mile - GM <br />10. Gallons - GA <br />11. Thousand Gallons - MG <br /> <br />PART 2 - PRODUCTS (Not applicable) <br /> <br />PART 3 - EXECUTION <br /> <br />3.01 MEASUREMENT AND PAYMENT <br /> <br />A. Electrical <br />1. Single Pole Mounted Fixture Assembly: <br /> <br />Measurement: The quantity to be paid for under this section for <br />installing the city furnished pole mounted fixture assembly will be <br />based upon actual quantity installed in completion and acceptance <br />of the Owner of each item in place, as indicated on the drawings, all <br />in accordance with the Contract Documents. <br /> <br />Payment: For installing pole-mounted fixture assembly will be <br />made at the Contract Unit price per each named Bid Item. Unit <br />Price will constitute as full compensation to install the pole mounted <br />fixture assembly, complete in place, including all necessary and <br />appurtenant work and materials. Appurtenant work and materials <br />shall include but not limited to furnishing and installing the pole <br />mounted fixture assembly and holiday receptacles. <br /> <br />2. Twin Pole Mounted Fixture Assembly: <br /> <br />Measurement: The quantity to be paid for under this section for <br />installing the city furnished the pole mounted fixture assembly will <br />be based upon actual quantity installed in completion and <br /> <br />07/04 <br /> <br />01025-2 <br /> <br />03-4174 <br />