My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-07-01) Roadway Lighting Improv. NE 159TH ST. & NE 174TH ST.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 12:03:54 PM
Creation date
1/10/2011 9:58:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Roadway Lighting Improv.
Bid No. (xx-xx-xx)
04-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />C. The Project Mobilization <br />1. The project mobilization item shall be administered in accordance <br />with the Florida Department of Transportation, Standard <br />Specifications for Road & Bridge Construction (latest edition); <br />MOBILIZATION. <br />2. The maximum amount allowed for the mobilization and <br />demobilization item shall be five (5) percent of the total contract <br />amount. <br />3. Mobilization includes, but is not limited to, mobilization of <br />equipment, all surveying, all supervision, cost of all bonds and <br />warranties, all permit fees, all insurance and demobilization. <br /> <br />3.02 PROTECTION <br /> <br />A. Where pavement, trees, shrubbery, fences or other property or surface <br />structures not designated as pay items, have been damaged, removed or <br />disturbed by the Contractor, whether deliberately or through failure to <br />carry out the requirements of the Contract Documents, state laws, <br />municipal ordinances or the specific direction of the Engineer, or through <br />failure to employ usual and reasonable safeguards, such property and <br />surface structures shall be replaced or repaired at the expense of the <br />Contractor to a condition equal to that before work began within a time <br />frame approved by the Engineer. <br /> <br />END OF SECTION <br /> <br />07/04 <br /> <br />01025-5 <br /> <br />03-4174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.