My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-07-01) Roadway Lighting Improv. NE 159TH ST. & NE 174TH ST.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2011 12:03:54 PM
Creation date
1/10/2011 9:58:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Roadway Lighting Improv.
Bid No. (xx-xx-xx)
04-07-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />07/04 <br /> <br />upon actual quantity installed in completion and acceptance of the <br />Owner of each item in place, as indicated on the drawings, all in <br />accordance with the Contract Documents. <br /> <br />Payment: For furnishing and installing the precast concrete pull <br />boxes will be made at the Contract Unit price per each named Bid <br />Item. Unit Price will constitute as full compensation to furnish and <br />install precast concrete pull boxes, complete in place, including all <br />necessary and appurtenant work and materials as shown on the <br />Contract Documents. Appurtenant work and materials shall include <br />but not limited to that shown on the contract documents. <br /> <br />6. FPL Furnished Handhole: <br /> <br />Measurement: The quantity to be paid for under this section for <br />furnishing and installing the precast concrete pull boxes based <br />upon actual quantity installed in completion and acceptance of the <br />Owner of each item in place, as indicated on the drawings, all in <br />accordance with the Contract Documents. <br /> <br />Payment: For furnishing and installing the precast concrete pull <br />boxes will be made at the Contract Unit price per each named Bid <br />Item. Unit Price will constitute as full compensation to furnish and <br />install precast concrete pull boxes, complete in place, including all <br />necessary and appurtenant work and materials as shown on the <br />Contract Documents. Appurtenant work and materials shall include <br />but not limited to that shown on the contract documents. <br /> <br />7. Conduit and Wire: <br /> <br />Measurement: The quantity to be paid for under this section for <br />furnishing and installing the conduit & wire based upon actual <br />quantity installed in completion and acceptance of the Owner of <br />each item in place, as indicated on the drawings, all in accordance <br />with the Contract Documents. <br /> <br />Payment: For furnishing and installing the conduit and wire will be <br />made at the Contract Unit price per each named Bid Item. Unit <br />Price will constitute as full compensation to furnish and install the <br />conduit and wire, complete in place, including all necessary and <br />appurtenant work, materials and testing as shown on the Contract <br />Documents. Appurtenant work and materials shall include but not <br />limited to that shown on the contract documents. <br /> <br />B. <br /> <br />Contingency: See Specification Section 01021, "Cash Allowances." <br /> <br />01025-4 <br /> <br />03-4174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.