My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 04-08-01 Security System for SIB Gov. Ctr.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 3:01:20 AM
Creation date
1/11/2011 9:08:19 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Security System for SIB Gov. Ctr.
Bid No. (xx-xx-xx)
04-08-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 17715 <br />DURESS SYSTEM <br />PART1 GENERAL <br />1.1. SCOPE <br />A. This section of the specifications requires the complete installation of the system as indicated <br />on the drawings and /or specified herein. <br />B. Furnish, install, and deliver materials required to make the systems complete and of <br />professional quality, including any miscellaneous items necessary for proper operation, but not <br />specifically mentioned. Provide all labor and supervision to check out, adjust and calibrate total <br />system. The only exemptions are items specifically listed as "work by others ". <br />C. Confirm voltage and frequency of systems and components and match with facility power <br />distribution system. Confirm all electrical standards for the country of concern to be acceptable. <br />This includes US standards organizations such as EIA (Electronic Industries Association) or <br />International standards bodies such as CCIR (International Radio Consultative Committee). <br />1.2. PREFABRICATION INSTALLATION MEETINGS <br />A. Prior to fabrication and system(s) installation, coordinate with the Architect and Owner to insure <br />system(s) work with building components, specifically including, but not limited to, the building <br />fire management system. <br />B. Verify all site conditions prior to installation, and coordinate work with the Architect and Owner <br />to assure a timely installation. The Security System Installer shall abide by any and all local <br />codes, manufacturers recommendations, safe work practices and shall secure any or all <br />applicable permits or licenses to complete said work. <br />1.3. SUBMITTALS <br />A. Submit for approval, within 30 days of award of contract or as required by Owner's schedule, but <br />prior to purchase or fabrication of equipment, 5 copies of the following: <br />1. A complete equipment list, with model numbers, manufacturers, quantities, and <br />specification "cut" sheets of all equipment used, broken down by system. <br />2. Equipment layout drawings for each room, with model numbers. <br />3. Proposed construction details for any custom built equipment. Drawings of custom panels <br />and labeling. Include proposed labels and layouts for switch panels, pictorial panels, and <br />receptacle plates. <br />4. Total systems block diagrams broken down by system. Drawings should include proposed <br />terminal block numbers, cable types and sizes, device location labeling, and wiring <br />diagrams for proposed switching systems and custom electronics. <br />5. Provide any revision to the Contract drawings, showing any relocation of devices, cabling, or <br />circuiting that may be warranted. <br />6. Warranty statement with proper dates filled in at the time of final acceptance. <br />8/04 17715 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.