My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-01) Fencing & Curbing Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:57:31 AM
Creation date
1/13/2011 10:58:44 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Fencing & Curbing Improv.
Bid No. (xx-xx-xx)
04-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />The entrained air, as measured by the Pressure Method, ASTM C231, shall be as shown in <br />(Table Q. <br />Nominal Maximum Size <br />of Coarse Aggregate(in) <br />2" <br />1" <br />3/4" <br />1.07 ACCEPTANCE TESTS <br />Total Air Measured at <br />Discharge from trick ( %) <br />2.5-5.5 <br />6.5 <br />4.0-8.0 <br />A. Conformity of aggregates to these Specification, and the actual proportions of cement, <br />aggregates, and water necessary to produce concrete conforming to the requirements set <br />forth in Table A, shall be determined by tests made with representative samples of the <br />materials to be used on the work. Tests will be made by an accredited testing laboratory, <br />and approved by the Engineer. <br />B. Cement may be subject to testing to determine that it conforms to the requirements of this <br />Specification. Methods of testing shall conform to the appropriate specification, but the <br />place, time, frequency and method of sampling will be determined by the Engineer in <br />accordance with the particular need. <br />C. Water content of the concrete shall be based on a curve showing the relation between water <br />content and 7 and 28 -day compressive strengths of concrete made using the proposed <br />materials. The curves shall be determined by four or more points, each representing an <br />average value of at least three test specimens at each age, and shall have a range of values <br />sufficient to yield the desired data, including all the compressive strengths called for on the <br />Drawings, without extrapolation. The water content of the concrete to be used, as <br />determined from the curve, shall correspond to the test strengths of the laboratory trial <br />mixtures as shown on (Table D) below. <br />Design <br />Min. Lab. <br />Strength <br />Strength <br />7 Days* <br />28 Days ** <br />3000 <br />2500 <br />3500 <br />3500 <br />3000 <br />4100 <br />4000 <br />3500 <br />4600 <br />* May be employed by preliminary design. <br />** To be used for final designs. <br />E. In no case, however, shall the resulting mix conflict with the limiting values for maximum <br />water - cement ratios and minimum cement contents as specified in Table A. <br />1 12/04 03300 -4 03 -4138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.