My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-01) Fencing & Curbing Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:57:31 AM
Creation date
1/13/2011 10:58:44 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Fencing & Curbing Improv.
Bid No. (xx-xx-xx)
04-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Unit Price Abbreviations: <br />3.01 MEASUREMENT AND PAYMENT <br />A. Furnish and Install Black Metal Picket Fence <br />' 1. Measurement for payment for furnishing and installing a six -foot (6') high black <br />metal picket fence will be based upon the actual number of linear feet of such <br />' fencing, all in accordance with the requirements of the Contract Documents. <br />2. Payment for furnishing and installing a six -foot (6') high black metal picket <br />fence will be made at the unit price per linear feet named in the Bid Schedule <br />which price shall constitute full compensation for completing said work, <br />including all earthwork, construction of fencing, disposal of excess material, <br />restoration of areas disturbed by the operations, and the appurtenant items for <br />' which separate payment is not specifically included in the Bid Schedule. <br />B. Furnish and Install Shoulder Gutter <br />1. Measurement for payment for furnishing and installing shoulder gutters will be <br />based upon the actual number of linear feet of such shoulder gutter constructed as <br />determined by measurement along the centerline of the curb in place, all in <br />accordance with the requirements of the Contract Documents. <br />' 2. Payment for furnishing and installing shoulder gutters will be made at the unit <br />price per linear feet named in the Bid Schedule which price shall constitute full <br />compensation for complete installation including grading, placing four - inches <br />' (4 ") of limerock pad, forming, saw cutting of pavement and curbing, and cleanup <br />of all areas disturbed by this construction. <br />' C. Remove and Dispose Existing Chain -Link Fence <br />1. Measurement for payment to remove and dispose of existing fences will be based <br />' upon the actual number of linear feet of such fence actually removed from the <br />right -of -way, all in accordance with the requirements of the Contract Documents. <br />1 12/04 01025 -2 03 -4138 <br />1. <br />Lineal Feet - LF <br />' <br />2. <br />Acre - AC <br />3. <br />Cubic Yard - CY <br />4. <br />Square Yard - SY <br />' <br />5. <br />Each - EA <br />6. <br />Lump Sum - LS <br />' <br />7. <br />8. <br />Ton - TN <br />Net Mile - NM <br />9. <br />Gross Mile - GM <br />10. <br />Gallons - GA <br />' <br />11. <br />Million Gallons - MG <br />PART 2 - PRODUCTS <br />(Not applicable) <br />PART 3 - EXECUTION <br />3.01 MEASUREMENT AND PAYMENT <br />A. Furnish and Install Black Metal Picket Fence <br />' 1. Measurement for payment for furnishing and installing a six -foot (6') high black <br />metal picket fence will be based upon the actual number of linear feet of such <br />' fencing, all in accordance with the requirements of the Contract Documents. <br />2. Payment for furnishing and installing a six -foot (6') high black metal picket <br />fence will be made at the unit price per linear feet named in the Bid Schedule <br />which price shall constitute full compensation for completing said work, <br />including all earthwork, construction of fencing, disposal of excess material, <br />restoration of areas disturbed by the operations, and the appurtenant items for <br />' which separate payment is not specifically included in the Bid Schedule. <br />B. Furnish and Install Shoulder Gutter <br />1. Measurement for payment for furnishing and installing shoulder gutters will be <br />based upon the actual number of linear feet of such shoulder gutter constructed as <br />determined by measurement along the centerline of the curb in place, all in <br />accordance with the requirements of the Contract Documents. <br />' 2. Payment for furnishing and installing shoulder gutters will be made at the unit <br />price per linear feet named in the Bid Schedule which price shall constitute full <br />compensation for complete installation including grading, placing four - inches <br />' (4 ") of limerock pad, forming, saw cutting of pavement and curbing, and cleanup <br />of all areas disturbed by this construction. <br />' C. Remove and Dispose Existing Chain -Link Fence <br />1. Measurement for payment to remove and dispose of existing fences will be based <br />' upon the actual number of linear feet of such fence actually removed from the <br />right -of -way, all in accordance with the requirements of the Contract Documents. <br />1 12/04 01025 -2 03 -4138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.