My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(04-12-01) Fencing & Curbing Improv.
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 2:57:31 AM
Creation date
1/13/2011 10:58:44 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Fencing & Curbing Improv.
Bid No. (xx-xx-xx)
04-12-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Payment for removal and disposal of existing fences will be made at the unit <br />' price per linear feet named in the Bid Schedule which price shall constitute full <br />compensation for completing said work, including the appurtenant items for <br />which separate payment is not specifically included in the Bid Schedule. <br />' D. Project Mobilization <br />' 1. The project mobilization item shall be administered in accordance with the <br />Florida Department of Transportation, Standard Specifications for Road & <br />Bridge Construction (latest edition); MOBILIZATION. <br />2. The maximum amount allowed for the mobilization item shall be ten percent <br />' (10 %) of the total contract amount. <br />3. Mobilization includes, but is not limited to, mobilization of equipment, all <br />surveying, all supervision, cost of all bonds and warranties, all permit fees, and <br />' all insurance. <br />3.02 PROTECTION <br />' A. Where pavement, trees, shrubbery, fences or other property or surface structures have <br />been damaged, removed or disturbed by the Contractor, whether deliberately or through <br />failure to carry out the requirements of the Contract Documents, state laws, municipal <br />ordinances or the specific direction of the Engineer, or through failure to employ usual <br />and reasonable safeguards, such property and surface structures shall be replaced or <br />' repaired at the expense of the Contractor to a condition equal to that before work began <br />within a time frame approved by the Engineer. <br />' 3.03 SUBMITTALS <br />A. On lump sum items, a complete schedule of values must be submitted at the pre - <br />construction meeting by the contractor. <br />IEND OF SECTION <br />L <br />1 12/04 01025 -3 03 -4138 <br />
The URL can be used to link to this page
Your browser does not support the video tag.